AR6 CONSTRUCTION & ENGINEERING, LLC
NEW BRAUNFELS, TEXAS 781322652
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $6.40M | 4 |
| 237110 | $6.00M | 2 |
| 237310 | $951K | 8 |
| 238160 | $50K | 1 |
Contract Awards
11 awards found
HANGAR RENOVATION
THE PURPOSE OF THE PROJECT IS TO REPAIR THE ERODED LAGOON WALL OR CLAY LINER, REPLACE WITH A GEOMEMBRANE LINER, AND INSTALL A LEAK DETECTION SYSTEM IN THE WASTEWATER LAGOON 1.
REPAIR AND REPLACE LINER FOR WATER LAGOON.
THE GOVERNMENT INCORRECTLY CONDUCTED THE SOURCE SELECTION, NOT FOLLOWING THE TERMS OF THE SOLICITATION. THIS LED TO THE GOVERNMENT CONDUCTING A SECOND SOURCE SELECTION AND THEN DETERMINING THAT SOURCE SELECTION WAS INDEED COMPLETED INCORRECTLY.
THIS PROJECT IS FOR REPAIR BY MILL AND OVERLAY SEVERAL SECTIONS OF THE OVERRUNS ON THE CENTER RUNWAY TO INCLUDE EDGE LIGHTING TO BRING IT UP TO CURRENT STANDARDS.
EXERCISE ALL OPTIONS ON CONTRACT.
HAZMAT TRAINING ROAD
ALL CURRENT T-6 AIRCRAFT PARKING SPOTS BETWEEN ROWS ALPHA AND KILO HAVE MOORING POINTS
TO INCORPORATE ADDITIONAL IN-SCOPE WORK FOR REPAIRING OF THE(UPS). DURING THE DIAGNOSTICS SERVICE, THE KTR IDENTIFIED 3 UPS THAT REQUIRE REPAIRS. THE INTENT OF THESE REPAIRS WAS TO RECTIFY THE ISSUE AND ENSURE SAFE FUNCTIONALITY OF THE UPS SYSTEMS
IS TO CHANGE IN SCOPE OF WORK AND DE-OBLIGATE ALL COSTS ASSOCIATED TO THE TERRAZZO FLOORING. THE TERRAZZO WILL BE SUBSTITUTED WITH A LESS COST-EFFECTIVE EPOXY MATERIAL WITH SLIP RESISTANT. BECAUSE OF THIS SUBSTITUTION THE GOV WILL RECEIVED CREDIT.
STOPPAGE REPAIR WEST RUNWAY FRICTION IMPROVEMENT
Business Details
- UEI
- V4M4CQUQLRE7
- CAGE Code
- 89HT6
- Address
- 26726 ROCKWALL PKWY
NEW BRAUNFELS, TX 781322652 - Congressional District
- TX-21
- Phone
- 5129401025
Parent Company
AR6 CONSTRUCTION & ENGINEERING, LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov