CALIFORNIA INSTITUTE OF TECHNOLOGY
DBA: CALTECH
PASADENA, CALIFORNIA 911250001
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541715 | $203.46M | 154 |
| 611310 | $11.90M | 16 |
Contract Awards
50 awards found
THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.
TO PROVIDE A HIGH HERITAGE SPACECRAFT BUS AND A WIDE FIELD ULTRAVIOLET TELESCOPE TO CONDUCT A DEEP IMAGING SURVEY OF THE WHOLE SKY IN TWO BANDS OF ULTRAVIOLET LIGHT TO PROVIDE NEW INSIGHTS INTO GALAXY EVOLUTION AND THE LIFECYCLE OF STARS.
THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.
FOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE A COMPLETE AND EQUITABLE ADJUSTMENT TO THE CONTRACTOR'S PROPOSAL "CALTECH PROPOSAL FOR UVEX PHASE B" DATED 10/3/2024, ADJUST AND INCREASE THE ESTIMATED COST OF THE CONTRACT AND UPDATE CONTRACT CLAUSES.
SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE.
SCIENCE SUPPORT CENTER FOR ROMAN PROJECT INCREMENTAL FUNDING
SCIENCE SUPPORT CENTER FOR ROMAN PROJECT INCREMENTAL FUNDING
ENGINEERING CHANGE PROPOSAL TO INCREASE CLIN 0003 CEILING FOR WORK WITHIN SCOPE.
SCIENCE SUPPORT CENTER FOR ROMAN PROJECT INCREMENTAL FUNDING
NOVEL ORBITAL AND MOON MANUFACTURING, MATERIALS, AND MASS-EFFICIENT DESIGN (NOM4D)
REMOVAL OF CLAUSES/DRDS IAW PCD 25-01 - THE EARTH SYSTEM EXPLORERS PROGRAM (ESEP) THE CARBON INVESTIGATION (CARBON-I) MISSION PHASE A CONCEPT STUDY.
INC FUND
THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.
SCIENCE SUPPORT CENTER FOR ROMAN PROJECT
INCREMENTAL FUNDING REMOVAL OF CLAUSES/DRDS IAW EXECUTIVE ORDERS (E.O.) 14173, 14168, 14148 AND 14057 NUSTAR PHASE E TASK 6 NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED. 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
NOVEL ORBITAL AND MOON MANUFACTURING, MATERIALS, AND MASS-EFFICIENT DESIGN (NOM4D)
THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.
SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE. MOD 56 - INC FUND
INC FUNDING
SCIENCE SUPPORT CENTER FOR ROMAN PROJECT
SCIENCE SUPPORT CENTER FOR ROMAN PROJECT
SCIENCE SUPPORT CENTER FOR ROMAN PROJECT
FOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
NUSTAR PHASE E TASK 6 NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED. 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
THIS MOD INCORPORATES NUSTAR PHASE E TASK 6. NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED. 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.
FOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE.
SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE. [PHASE EF]
FOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER
INC FUNDING
THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER
FOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
INC FUNDING
THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER
THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.
NOVEL ORBITAL AND MOON MANUFACTURING, MATERIALS AND MASS-EFFICIENT DESIGN (NOM4D) PROGRAM
SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE.
NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.
THE ULTRAVIOLET EXPLORER (UVEX)
NOVEL ORBITAL AND MOON MANUFACTURING, MATERIALS, AND MASS-EFFICIENT DESIGN (NO4MD) PROGRAM PHASE III
THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER
FOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE.
FOR LUNAR TRAILBLAZER PHASES C/D EFFORT, THE CONTRACTOR SHALL BASELINE OPERATIONAL PROCEDURES, FLIGHT SYSTEM OPERATIONS MANUALS, KEY FLIGHT SEQUENCES, AND PREPARE FOR THE PROJECT LEVEL CRITICAL DESIGN REVIEW AND SYSTEM INTEGRATION REVIEW.
INC FUNDING
THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.
THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER
Business Details
- UEI
- U2JMKHNS5TG4
- CAGE Code
- 80707
- Address
- 1200 E CALIFORNIA BLVD
PASADENA, CA 911250001 - Congressional District
- CA-28
- Phone
- 6263956219
Parent Company
CALIFORNIA INSTITUTE OF TECHNOLOGY
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov