DOFINE SPRINKLER REBUILDERS INC
BURLEY, IDAHO 833181602
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $16.75M | 74 |
| 237310 | $4.74M | 6 |
| 237990 | $2.19M | 14 |
| 221310 | $919K | 6 |
| 238290 | $200K | 2 |
| 238350 | $49K | 4 |
| 238110 | $45K | 1 |
| 237110 | $25K | 4 |
Contract Awards
50 awards found
GAOA FLAMING GORGE NRA WATER SYS REPAIR ASHLEY NF ADD OPTIONAL ITEMS
CONTROL PANEL AND GUIDANCE FOR IRRIGATION SYSTEM
NV-DESERT NWRC-FIRE CACHE AND BUNKHOUSE - LINE-ITEM ASSOCIATED WITH 1,2,3,6
FORT HALL MEDICAL RECORDS RENOVATION
REMOVE EXISTING CULVERTS AND INSTALL NEW CONCRETE BRIDGE. MOD P00002 TO EXTEND POP AND ADD WORK TO REMOVE AND REPLACE DIFFERING SITE CONDITION OF CLAY FOUND IN FOUNDATION.
GAOA FLAMING GORGE NRA WATER SYS REPAIR ASHLEY NF
REHABILITATE TRAILER DUMP STATION ACCORDING TO THE ATTACHED STATEMENT OF WORK AND SPECIFICATIONS.
CA-SAN JQN RIV NWR-GAOA-LFT PMP FSH SCRN
WA MAKAH NFH ADULT POND WATER VALVE
CONSTRUCTION OF VERTICAL LIFT, POCATELLO SUPPLY DEPOT
WA MAKAH NFH ADULT POND WATER VALVE
NV-DESERT NWRC-WHIN-MARSH LEVEE REPAIR
CEDAR POINT CAMP HOST SITE IMPROVEMENT
SIMPSON SPRINGS CAMPGROUND PHASE 3
CONCRETE PAD REPLACEMENT
0402 GAOA, CONSTRUCTION THIS PROJECT MAKES IMPROVEMENTS TO THE KIRKHAM HOT SPRING SITE TO MODIFY IT FROM A CAMPGROUND INTO A DAY USE AREA THAT WILL BETTER HANDLE INCREASED VISITATION. THE WORK WILL BE SPLIT INTO A BASE AND SEVERAL OPTIONS. WORK
GAOA DUCK CREEK CAMPGROUND RECONSTRUCTION PROJECT MOD 2: THE PURPOSE OF THIS MODIFICATION IS TO: 1-EXERCISE OPTIONS PER ATTACHED LIST. 2-EXTEND THE PERIOD OF PERFORMANCE TO JULY 19, 2025 NO OTHER CHANGES ARE BEING MADE AT THIS TIME. MOD
TASK ORDER AWARD TO REHABILITATE FAILING SEWALL AT SPRING CANYON BOAT LAUNCH, LAKE ROOSEVELT NATIONAL RECREATION AREA (LARO) [TASK ORDER COMPETED/AWARDED THROUGH THE U.S. FISH AND WILDLIFE SERVICE (USFWS), ALT/REPAIR CONSTRUCTION SERVICES MULTIPLE AW
AWARDING OPTION 4 - REPAVE BANKS GRADE ROAD AND ADDITIONAL ASPHALT PATCH FOUND TO NEED REPLACEMENT.
CHICAGO MARSH ELECTRICAL REPAIR AT THE DON EDWARDS SAN FRANCISCO BAY NATIONAL WILDLIFE REFUGE
SIMPSON SPRINGS CAMPGROUND PHASE 3
RANDOLPH SHOP DEMOLITION
AWARDING OPTION 3 - BOAT SLIDE CONSTRUCTION.
US FWS WA-JULIA BUTLER RFG-BARGE LANDING REPAIR
CEDAR POINT CAMP HOST SITE IMPROVEMENT
0413 GAOA 4BM SCNF BOUNDARY DAGGER ROAD STANLEY LANDMARK AND DIS SEAFOAM RD CRUSHING AND SURFACING - THE PROJECT CONSISTS OF PREPARING PITS, MINING MATERIALS, CRUSHING PIT MATERIAL INTO SUITABLE BLENDED AGGREGATE WITH COMMERCIAL SOURCE ADDITIVES MEET
REMOVE EXISTING CULVERTS AND INSTALL NEW CONCRETE BRIDGE
SMOKEY MOUNTAIN VAULT TOILET
1. THIS PROJECT MAKES IMPROVEMENTS TO BANKS ACCESS BY EXTENDING THE EXISTING BOAT RAMP. 2. OPTION 1: PARKING LOT REPAIRS. 3. OPTION 2: KAYAK PATH MAINTENANCE. 4. OPTION 3: BOAT SLIDE INSTALLATION. 5. OPTION 4: PAVE BANKS GRADE ROAD.
CHICAGO MARSH ELECTRICAL REPAIR AT THE DON EDWARDS SAN FRANCISCO BAY NATIONAL WILDLIFE REFUGE
0402 GAOA, CONSTRUCTION THIS PROJECT MAKES IMPROVEMENTS TO THE KIRKHAM HOT SPRING SITE TO MODIFY IT FROM A CAMPGROUND INTO A DAY USE AREA THAT WILL BETTER HANDLE INCREASED VISITATION. THE WORK WILL BE SPLIT INTO A BASE AND SEVERAL OPTIONS. WORK
GAOA DUCK CREEK CAMPGROUND RECONSTRUCTION PROJECT MOD 1: THE PURPOSE OF THIS MODIFICATION IS TO EXERCISE OPTIONS TO PLACE AGGREGATE IN LOOPS B, C AND D PER ATTACHED LIST. NO OTHER CHANGES ARE BEING MADE AT THIS TIME. BASE: GAOA DUCK CREEK
THE M1 LANDSLIDE BARR CREEK GATE INSTALLATION PROJECT IS A DOI MATOC ORDER FOR THE REMOVAL AND DISPOSAL OF A MALFUNCTIONING GATE TO BE REPLACED VIA FABRICATION AND INSTALLATION OF 2 GATES IN THE MENDOCINO NATIONAL FOREST.
US FWS WA-JULIA BUTLER RFG-BARGE LANDING REPAIR
GAOA: 4CN SALMON RIVER ROAD CORRIDOR RECREATION SITE MAINTENANCE AKA "CORN CREEK BUILDING DECOMMISSIONING"
WILSON LAKE SITE IMPROVEMENTS
THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE THE MINIMUM GUARANTEE FROM THE MASTER CONTRACT 1240LR21D0003. ALL MINIMUM GUARANTEES UNDER THE MASTER CONTRACT HAVE BEEN MET. THIS DEOBLIGATION WILL CLOSE TASK ORDER NUMBER 1240LR21F0005.
SIMPSON SPRINGS CAMPGROUND REDEVELOPMENT PHASE 2
US FWS WA-JULIA BUTLER RFG-BARGE LANDING REPAIR
CHANGE CO FROM ANN (PEGGY) DOBIE TO TANYA SPANFELLNER
GAOA DUCK CREEK CAMPGROUND RECONSTRUCTION PROJECT AWARD OF BASE ITEMS ONLY. PER ATTACHED SCHEDULE OF ITEMS AND PRICING. PERIOD OF PERFORMANCE 10/10/2023-12/31/2024
KITTY HAWK EAST FENCING REPLACE FENCING ON THE EAST SIDE OF THE KITTY HAWK ADMIN SITE IN CEDAR CITY, UTAH
MAHOGANY EROSION REPAIRS HTNF
RETROFIT & REPLACEMENT OF LIGHT FIXTURES & OTHER WAREHOUSE IMPROVEMENTS
RETROFIT & REPLACEMENT OF LIGHT FIXTURES & OTHER WAREHOUSE IMPROVEMENTS
SIMPSON SPRINGS CAMPGROUND REDEVELOPMENT PHASE 2
SMOKEY MOUNTAIN VAULT TOILET
NV-PAHRANAGAT NWR-NORTH MARSH LEVEE MOD 1 FUNDS GEO TEXTILE FOR THE SOUTH BANK
THIS PROJECT INCLUDES REPLACEMENT OF EXISTING ASPHALT SHINGLE ROOF WITH STANDING SEAM SHEET METAL ROOF WITH SNOW GUARDS ON MULTIPLE GOVERNMENT OWNED RESIDENTIAL HOUSES AND AN OFFICE BUILDING AT THE AUSTIN RANGER DISTRICT RESIDENTIAL COMPOUND AND THE
MODIFICATION #4 ELECTRICAL CONTROL FIX MODIFICATION #3 ENG-D6 U KRASSEL WC ELECTRICAL UPGRADES MODIFICATION 2 CHANGE CO FROM KAREN MORTHLAND TO TANYA SPANFELLNER MODIFICATION 1 KRASSELL WORK CENTER TANK REPLACEMENT PROJECT
Business Details
- UEI
- SEMCHAJ79BZ5
- CAGE Code
- 7HNC5
- Address
- 218 W 13TH
BURLEY, ID 833181602 - Congressional District
- ID-02
- Phone
- 2086705699
Parent Company
DOFINE SPRINKLER REBUILDERS INC
Data Source
This profile is based on federal contract award data from USAspending.gov.