TOTAL SOLUTION LLC
SANTA ANA, CALIFORNIA 927041342
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 333415 | $506K | 5 |
| 238220 | $504K | 18 |
| 236220 | $308K | 5 |
| 333914 | $299K | 6 |
| 561210 | $268K | 5 |
| 237990 | $240K | 2 |
| 811310 | $217K | 5 |
| 335910 | $169K | 4 |
| 238290 | $166K | 8 |
| 562998 | $130K | 1 |
Contract Awards
50 awards found
INSULATE POTATO STORAGE BARN - PRESQUE ISLA, ME
SUBFLOOR AND DOOR REPAIRS
LIQUID NITROGEN DELIVERY SYSTEM REPAIRS, WYNDMOOR, PA
99TH - ROUTINE - CSS 90343 - ARM GATE IS BROKEN. BELTS ARE OFF OF THE GATE CONTROLLER. GATE IS NEEDED FOR SECURITY AND AT THIS TIME THE UNITS HAVE NO WAY TO GET THEIR VEHICLES TO COME IN.
CRAC UNIT REPLACEMENT, B5028A
99TH - ROUTINE - CSS 90343 - ARM GATE IS BROKEN. BELTS ARE OFF OF THE GATE CONTROLLER. GATE IS NEEDED FOR SECURITY AND AT THIS TIME THE UNITS HAVE NO WAY TO GET THEIR VEHICLES TO COME IN.
BOST - EASTON BUIDLING FIRE PUMP REPAIR
FLOOR MAT REPLACEMENT
MOD P00001 - DE-OBLIGATE UNEXPENDED FUNDS & CLOSEOUT - REPAIR THE DOMESTIC WATER TREATMENT EQUIPMENT AT NEW MELONES POWERPLANT
LUBRICATION SYSTEM INSTALL FOR THE AGE FLIGHT
REPAIR TO HANGAR DOOR AT THE 144TH FIGHTER WING.
REPLACE AIR PLENUM CAPS, HOUMA, LA
CGC KICKAPOO UPH GENERATOR TRANSFER SWITCH REPLACEMENT
OR MALHEUR NWR UNIT 7 PIPE PHASE 2 TO PROVIDE AND DELIVER CULVERTS, WATER CONTROL STRUCTURES, BANDS AND ALL NECESSARY HARDWARE FOR ATTACHMENT.
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL, SUPPLIES AND SUPERVISION NECESSARY TO PERFORM CRANE REPAIR AND INSPECTION SERVICES FOR THE LIGHT CAPACITY FLEET IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT.
FCI PHOENIX FREEZER/COOLER SUPPLY INSTALL
BLDG 55 ELEVATOR DOOR OPERATOR ASSEMBLY REPLACEMENT
BLDG 55 ELEVATOR DOOR OPERATOR ASSEMBLY REPLACEMENT
INSULATE POTATO STORAGE BARN - PRESQUE ISLA, ME
REPAIR THE DOMESTIC WATER TREATMENT EQUIPMENT AT NEW MELONES POWERPLANT WITH THEIR PACKAGED "SKID" SYSTEM MANUFACTURED BY ALTAPAC.
SODIUM BATTERY INSTALL BUILDING 1004
SODIUM ION NICKEL BATTERY EFIT FOR BUILDING 1043
OR IRRIGON FISH HATCHERY HVAC
THE CONTRACTOR WILL FURNISH ALL PERSONNEL, EQUIPMENT, SUPPLIES, AND MATERIALS NECESSARY TO REMOVE AND REPLACE EXISTING CONTROL TOWER BRIDGE CRANE AND TROLLEY AT CAGLES MILL LAKE. PERIOD OF PERFORMANCE IS 180 DAYS FROM CONTRACT AWARD DATE.
BARREN RIVER LAKE HYDRAULIC REPLACEMENT.
ATS REPLACEMENT
EMERGENCY HVAC REPAIRS AT THE CHAL VC
THE CONTRACTOR WILL FURNISH ALL PERSONNEL, EQUIPMENT, SUPPLIES, AND MATERIALS NECESSARY TO REMOVE AND REPLACE EXISTING CONTROL TOWER BRIDGE CRANE AND TROLLEY AT CAGLES MILL LAKE. PERIOD OF PERFORMANCE IS 180 DAYS FROM CONTRACT AWARD DATE.
THE CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, AND MATERIALS TO CONDUCT INSPECTION, TEAR-DOWN, DISASSEMBLY, AND EVALUATION OF THE PUMP.
FY24 BUILDING #1000 ASHLAND RESIDENCE UPGRADES SIDING, WINDOWS AND INSULATION MODIFICATION 2 ADDITION OF WORK WITHIN SCOPE TO REPLACE GUTTERS, REPAIR WALLS, INSULATION AND PAINT STOOP
EMERGENCY BOILER REPAIR IN DAYTON MANOR
SODIUM BATTERY INSTALL BUILDING 1004
SODIUM ION NICKEL BATTERY EFIT FOR BUILDING 1043
THE PURPOSE OF THIS REQUISITION IS TO REPLACE EXISTING WINDOWS IN 7 BUILDINGS AT THE CDA NURSERY TO IMPROVE ENERGY EFFICIENCY AND REDUCE ENERGY CONSUMPTION FOR HEATING AND COOLING OF THESE BUILDINGS.
MODIFY ELECTRICAL AND STRUCTURE FOR TARGET RETRIEVAL SYSTEM BUILDING 1145. SEE STATEMENT OF WORK (SOW) DATED 16 SEP 2024 FOR MORE DETAILS.
FURNISH & INSTALL WASHER & DRYER SAN LUIS NWR COMPLEX
BARREN RIVER LAKE ELECTRICAL UPGRADES
USCG AIRSTA DETROIT FIREMAIN REPAIR
HVAC FOR CENTRAL FERRY FARM DRYING SHED
REPLACE CRAC UNITS IN BLDG 5028A
12 NEW FANS INSTALLATION AND 21 VENTILATORS REMOVAL AND INSTALLATION - MEADOWOOD SPECIAL RECREATION MANAGEMENT AREA (SRMA)
TRAILER MOUNTED WATER PUMP, MITTRY LAKE
SPRINKLER REPAIR MATERIALS
REPLACE AIRBOAT ENGINE STAND
NORTHAMPTON MA VAMC STAIRWELL EGRESS BARRIES
GERING SERVICE CENTER OFFICE HVAC - PROVIDING ALL MATERIALS, LABOR, AND EQUIPMENT FOR: A. REMOVAL AND PROPER DISPOSAL OF EXISTING CONDENSING UNIT, AND ALL ASSOCIATED INSTALLATION COMPONENTS. B. INSTALLATION OF NEW CONDENSING UNIT, AND ALL ASSOCIATED
BUILDING 597 HIGH BAY DOOR REPLACEMENT
WE ARE NEEDING A CONTRACTOR TO REPAIR OUR CHILLERS, PROVIDE CARRIER CHILLER SOFTWARE AND TRAINING AT THE CENTRAL UTILITY PLANT (CUP). PROVIDE ALL THE UPDATED SOFTWARE, VIDEO TRAINING, AND REPAIR/INSPECTION REPORT. THIS WORK WILL BE IN THE CENTRAL UTI
REPLACE TWO LIEBERT HVAC UNITS AT THE UTICA JUNCTION SUB: LESTERVILLE, SD
TRAILER MOUNTED WATER PUMP, MITTRY LAKE
Business Details
- UEI
- RL1WBD4YKJC4
- CAGE Code
- 9TFP3
- Address
- 160 S HARBOR BLVD STE K
SANTA ANA, CA 927041342 - Congressional District
- CA-46
- Phone
- 7142615402
Parent Company
TOTAL SOLUTION LLC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov