BRPH ARCHITECTS ENGINEERS INC
DBA: BRPH ARCHITECTS-ENGINEERS INC
MELBOURNE, FLORIDA 329407514
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541330 | $3.64M | 93 |
| 541310 | $0 | 5 |
Contract Awards
40 awards found
ESDC CCF SCS BLOCK 1B PHASE 1 LC-39B
SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO PROVIDE ENGINEERING SERVICE DURING CONSTRUCTION FOR A BERM FACILITY AT KENNEDY SPACE CENTER, FLORIDA
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF BOOSTER FABRICATION FACILITY (BFF) CRANE REFURBISHMENT
ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF UPGRADE LIQUID HYDROGEN (LH) 2 SYSTEM, LAUNCH COMPLEX (LC)-39B PCN:98985
SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO REPLACE T-10 TRANSFORMER AT C5 SUBSTATION AT KENNEDY SPACE CENTER, FLORIDA
TASK ORDER 80KSC019F0122 FOR ENGINEERING SERVICES DURING THE CONSTRUCTION OF INSTALL VAB EM-2 ECS, PROJECT CONTROL NUMBER (PCN): 99500.2, AT KENNEDY SPACE CENTER, FL,
ENGINEERING SERVICES DURING THE CONSTRUCTION TO CONVERTER COMPRESSOR FACILITY.
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF INSTALL LIQUID NITROGEN (LN2) SYSTEM, LAUNCH COMPLEX 39B (LC-39B)
SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO REPLACE T-10 TRANSFORMER AT C5 SUBSTATION AT KENNEDY SPACE CENTER, FLORIDA
ENGINEERING SERVICES DURING THE CONSTRUCTION TO CONVERTER COMPRESSOR FACILITY.
ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) UPGRADE HEATING VENTILATION AND AIR CONDITIONING (HVAC) AT BOOSTER FABRICATION FACILITY(BFF) COMPLEX
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF INSTALL LIQUID NITROGEN (LN2) SYSTEM, LAUNCH COMPLEX 39B (LC-39B)
ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) UPGRADE HEATING VENTILATION AND AIR CONDITIONING (HVAC) AT BOOSTER FABRICATION FACILITY(BFF) COMPLEX
ENGINEERING SERVICES DURING THE CONSTRUCTION OF INSTALL VEHICLE ASSEMBLY BUILDING HIGH BAY 3 ENVIRONMENTAL CONTROL SYSTEM (ECS), KENNEDY SPACE CENTER, FL.
ENGINEERING SERVICES DURING THE CONSTRUCTION OF INSTALL VEHICLE ASSEMBLY BUILDING HIGH BAY 3 ENVIRONMENTAL CONTROL SYSTEM (ECS), KENNEDY SPACE CENTER, FL.
SOUTHEAST REGIONAL ARCHITECT ENGINEERING (SERAE) CONTRACT DESIGN FOR CONSTRUCTION OF AN EARTHEN BERM AT FACILITY 77800 CAPE CANAVERAL SPACE FORCE STATION
ENGINEERING SERVICES DURING THE CONSTRUCTION OF INSTALL VEHICLE ASSEMBLY BUILDING HIGH BAY 3 ENVIRONMENTAL CONTROL SYSTEM (ECS), KENNEDY SPACE CENTER, FL.
ENGINEERING SERVICES DURING THE CONSTRUCTION TO CONVERTER COMPRESSOR FACILITY. INCORPORATES ADDITIONAL WORK.
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF INSTALL LIQUID NITROGEN (LN2) SYSTEM, LAUNCH COMPLEX 39B (LC-39B)
TASK ORDER 80KSC019F0122 FOR ENGINEERING SERVICES DURING THE CONSTRUCTION OF INSTALL VEHICLE ASSEMBLY BUILDING HIGH BAY 3 ENVIRONMENTAL CONTROL SYSTEM (ECS), KENNEDY SPACE CENTER, FL, P00010 MODIFICATION TO ADD SCOPE OF WORK
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF BOOSTER FABRICATION FACILITY (BFF) CRANE REFURBISHMENT
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF UPGRADE MISSILE GRADE AIR (MGA) SYSTEM AT BOOSTER FABRICATION FACILITY (BFF). INCORPORATES TECHNICAL DIRECTIVE (TD)-01. FUNDING AND VALUES ARE INCREASED. PERIOD OF PERFORMANCE EXTENDED.
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF INSTALL VEHICLE ASSEMBLY BUILDING (VAB) EXPLORATION MISSION 2 (EM-2) ENVIRONMENTAL CONTROL SYSTEMS. INCORPORATES TECHNICAL DIRECTIVE 08 AND EXTENDS END DATE TO DECEMBER 15, 2023.
ENGINEERING SERVICES DURING THE CONSTRUCTION OF MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SPACE LAUNCH SYSTEM BLOCK 1B, PHASE 1, AT KENNEDY SPACE CENTER, FLORIDA. INCORPORATES TECHNICAL DIRECTIVE 04 AND EXTENDS AWARD TO MARCH 3, 2024.
DESIGN OF INSTALL LIQUID NITROGEN (LN2) SYSTEM, LAUNCH COMPLEX 39B (LC-39B). INCORPORATES TECHNICAL DIRECTIVE 03 FOR $40,994.00, PERIOD OF PERFORMANCE CHANGED TO JULY 14, 2023.
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF INSTALL VEHICLE ASSEMBLY BUILDING (VAB) EXPLORATION MISSION 2 (EM-2) ENVIRONMENTAL CONTROL SYSTEMS. MOD 7: INCORPORATE TECHNICAL DIRECTIVE-07. FUNDING INCREASED, PERIOD OF PERFORMANCE EXTENDED
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF UPGRADE MISSILE GRADE AIR (MGA) SYSTEM AT BOOSTER FABRICATION FACILITY (BFF) MOD 2: INCORPORATE TECHNICAL DIRECTIVE (TD)-01. FUNDING AND VALUES ARE INCREASED. PERIOD OF PERFORMANCE EXTENDED.
ENGINEERING SERVICES DURING THE CONSTRUCTION UPGRADE OF THE LIQUID HYDROGEN II (LH2) SYSTEM. MOD 6: INCORPORATE TECHNICAL DIRECTIVE (TD)06. TASK ORDER IS INCREASED, AND PERIOD OF PERFORMANCE IS EXTENDED.
DESIGN OF INSTALL LIQUID NITROGEN (LN2) SYSTEM, LAUNCH COMPLEX 39B (LC-39B). INCORPORATES TECHNICAL DIRECTIVE 02 FOR $16,856.00, PERIOD OF PERFORMANCE REMAINS UNCHANGED.
DESIGN BOOSTER FABRICATION FACILITY (BFF) COMPLEX HEATING VENTILATION AIR CONDITIONING SYSTEMS UPGRADE. INCORPORATES TECHNICAL DIRECTIVE 04 FOR AN ADDITIONAL $6,134.
DESIGN BOOSTER FABRICATION FACILITY (BFF) COMPLEX HEATING VENTILATION AIR CONDITIONING SYSTEMS UPGRADE. INCORPORATES TECHNICAL DIRECTIVE 02 FOR AN ADDITIONAL $7,774.
DESIGN BOOSTER FABRICATION FACILITY (BFF) COMPLEX HEATING VENTILATION AIR CONDITIONING SYSTEMS UPGRADE. INCORPORATES TECHNICAL DIRECTIVE 01 FOR AN ADDITIONAL $28,103.
ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF REPLACE ROOFS AT BOOSTER FABRICATION FACILITY, PHASE 2, PROJECT CONTROL NUMBER 99398.
ENGINEERING SERVICES DURING THE CONSTRUCTION OF MODIFICATIONS TO CONVERTER COMPRESSOR FACILITY FOR SLS BLOCK 1B. INCORPORATES TECHNICAL DIRECTIVE 03 FOR $189,361 AND EXTENDS PERIOD OF PERFORMANCE TO MAY 21, 2023.
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF INSTALL VEHICLE ASSEMBLY BUILDING (VAB) EXPLORATION MISSION 2 (EM-2). INCORPORATES TECHNICAL DIRECTIVE 06 FOR $150,008 AND EXTENDS END DATE TO APRIL 30, 2023.
ENGINEERING SERVICES DURING THE CONSTRUCTION UPGRADE OF THE LIQUID HYDROGEN II (LH2) SYSTEM. MOD 5: INCORPORATES TECHNICAL DIRECTIVE (TD)-05, TASK ORDER IS INCREASED AND PERIOD OF PERFORMANCE IS EXTENDED TO 4/3/23.
BRIDGING DOCUMENT FOR BOOSTER FABRICATION FACILITY (BFF) CRANE REFURBISHMENT REV A AT KENNEDY SPACE CENTER, FL.
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF UPGRADE MISSILE GRADE AIR (MGA) SYSTEM AT BOOSTER FABRICATION FACILITY (BFF)
DESIGN OF INSTALL LIQUID NITROGEN (LN2) SYSTEM, LAUNCH COMPLEX 39B (LC-39B)
ENGINEERING SERVICES DURING THE CONSTRUCTION UPGRADE OF THE LIQUID HYDROGEN II (LH2) SYSTEM. INCORPORATES TECHNICAL DIRECTIVE 04, INCREASES AWARD $89,413.000 AND EXTENDS COMPLETION DATE TO OCTOBER 31, 2022.
Business Details
- UEI
- PFSXDMNJBKS8
- CAGE Code
- 9M604
- Address
- 5700 N HIGHWAY 1 STE 400
MELBOURNE, FL 329407514 - Congressional District
- FL-08
- Phone
- 3217513002
Parent Company
BRPH COMPANIES, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov