CASE, LOWE & HART, INC.
OGDEN, UTAH 844012346
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541330 | $3.50M | 86 |
Contract Awards
40 awards found
INSPECTION AND TESTING ASSOCIATED WITH THE GAOA PINE VALLEY DAM SPILLWAY CAPACITY AND LIQUEFACTION MITIGATION PROJECT.
TASK ORDER AGAINST AWARD 1240LR21D0010 FOR A&E SERVICES TO SUPPORT THE DESIGN OF THREE BRIDGE REPLACEMENTS.
0420 A&E ENGINEERING SUPPORT - FOREST SERVICED OWNED DAM MIDDLE PINEY 2025
P00002 DE-OBLIGATE EXCESS FUNDS
TASK ORDER- DESIGN SERVICES FOR BRIDGE REPLACEMENT
A&E TASK ORDER- DESIGN SERVICES FOR BRIDGE REPLACEMENT
0401 CONST A&E BUCKBOARD WATER SYSTEM DESIGN PHASE 2
TOPOGRAPHIC SURVEYS OF STREAM CROSSINGS AND CROSSING DESIGNS ON THE UINTA-WASATCH-CACHE NATIONAL FOREST
GAOA IDAHO AIRSTRIP DEFERRED MAINTENANCE DESIGN-PHASES 1 AND 2 MOD 5: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO SPLIT THE PROJECT INTO 3 DIFFERENT PLAN SETS, AND INCLUDE THE DESIGNS TO MODIFY THE EXISTING CULVERT. NO OTHER CHANGES ARE B
AE SERVICE, NORTH FORK OFFICE REMODEL AE DESIGN, BASE, REGION 4 AE IDIQ
ADMIN OFFICE: INTERMOUNTAIN REGION 324 25TH STREET OGDEN UT 84401 FMMI ACCOUNT: FS00.0417NFWF1724 BOC: 2540 PERIOD OF PERFORMANCE IS SEPTEMBER 30, 2024 2024 TO DECEMBER 30, 2025. TO DESIGN A BARRIER FEASIBILITY ASSESSMENT AND DESIGN ALTERN
A&E EAST ZONE BOUNDARY AND POSTING SURVEY
AE SERVICE, NEWLAND RANCH LAGOON SEEPAGE TESTING 2024, REGION 4 AE IDIQ TASK ORDER, BASE
BOUNDARY AND POSTING SURVEYS FOR THE UINTA-WASATCH-CACHE NATIONAL FOREST IN THE VICINITY OF MILLCREEK/PARLEYS CANYON AND BRIGHTON, UTAH : THE PURPOSE OF THIS TASK ORDER IS TO PROVIDE PROFESSIONAL SERVICES TO COMPLETE BOUNDARY AND POSTING SURVEYS
DESIGN OF MITIGATION FOR BUILDING SNOW MANAGEMENT, REPAIR OF SNOW/ ICE DAMAGE, AND INSTALLATION OF MISSING FLANGE BRACES FOR BRIDGEPORT WAREHOUSE
AE TASK 2024 DAMS ENGINEERING SUPPORT FOR REGION 4
UT-BEAR RIV MIG BRD-A/E EVALUATE HVAC
IIJA, SERVICE, CMJL MONUMENTAL AOP DESIGNS, REGION 1,4 AE MATOC BASE PLUS OPTIONS
0413 SERV REGION 4 STREAM HABITAT, HYDROLOGY, DIVERSION SURVEY TASK ORDER:CAMAS CREEK BRIDGE
0460 AE PAYETTE NF HOUSING HVAC INSPECTION SERVICES & TREE COOLER DESIGN
0460 AE PAYETTE NF HOUSING HVAC INSPECTION SERVICES & TREE COOLER DESIGN
GAOA IDAHO AIRSTRIP DEFERRED MAINTENANCE DESIGN-PHASES 1 AND 2 MOD 2: THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO: 1- EXERCISE THE PHASE III OPTION 2- EXTEND THE PERIOD OF PERFORMANCE TO NOVEMBER 15, 2024 NO OTHER CHANGES ARE BEING MADE
THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE $450.02 IN REMAINING FUNDS FROM THE TASK ORDER. ALL A&E SERVICES HAVE BEEN COMPLETED AND ALL INVOICES HAVE BEEN PROCESSED. THIS DEOBLIGATION MODIFICATION WILL CLOSE TASK ORDER 1202NV20F0040.
THIS TASK ORDER INVOLVES PHASE 1 OF THE SURVEYING, PLANNING, AND DESIGN FOR RECONSTRUCTION OF THE BUCKBOARD CAMPGROUND AND MARINA WATER SYSTEM AND THE HIDEOUT CANYON BOAT-IN CAMPGROUND WATER SYSTEM BOTH LOCATED IN THE FLAMING GORGE NATIONAL RECREATIO
A-E IDIQ MATOC SURVEYING SERVICES FOR THE MEDICINE BOW AND ROUTT NF - TROUBLESOME BOUNDARY POSTING PROJECT 1 AND MULLEN BOUNDARY PROJECTS 2 AND 3.
THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE CONTRACTING OFFICER FROM KELLIE SHAW TO TANYA SPANFELLNER. ALL FURTHER COMMUNICATIONS MUST GO TO AND NEW ACTIONS MUST BE SIGNED BY TANYA SPANFELLNER. ALL OTHER TERMS AND CONDITIONS OF THIS TASK ORDER
IIJA, SERVICE, CMJL MONUMENTAL AOP DESIGNS, REGION 1,4 AE MATOC BASE PLUS OPTIONS
AE LUCKY HEADHOUSE STRUCTURAL DESIGN AND GEOTECH INVESTIGATION
TOPOGRAPHIC SURVEYS OF STREAM CROSSINGS AND CROSSING DESIGNS ON THE UINTA-WASATCH-CACHE NATIONAL FOREST
SOUTH FORK DWELLING FOUNDATION ANALYSIS AND DESIGN. THE SOUTH FORK DWELLING IS HAVING ISSUES WITH FOUNDATION CRACKING, SETTLEMENT, AND PONDING OF WATER. THE PURPOSE OF THIS REQUISITION IS TO HAVE AN AE FIRM LOOK AT THE FOUNDATION OF THE BUILDING AND
2023 TASK ORDER PAVEMENT MANAGMENT IMPLEMENTATION, A&E
2022 DAM ENGINEERING SUPPORT - USFS INTERMOUNTAIN REGION (R4) THE PURPOSE OF THIS MODIFICATION IS TO CHANGE THE CONTRACTING OFFICER FROM KELLIE SHAW TO TANYA SPANFELLNER. ALL FURTHER COMMUNICATIONS MUST GO TO AND NEW ACTIONS MUST BE SIGNED BY TANY
GAOA IDAHO AIRSTRIP DEFERRED MAINTENANCE DESIGN-PHASES 1 AND 2
CONT A AND E, FISH LAKE SO ALTA SURVEY
USDA FOREST SERVICE FISHLAKE SUPERVISORS OFFICE RENOVATION DESIGN TASK ORDER THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING IN THE AMOUNT OF $8,327.37 FOR ADDITIONAL WORK THAT WAS PERFORMED PRIOR TO AUTHORIZATION. THE UNAUTHORIZED WORK PERFO
A-E IDIQ MATOC SURVEYING SERVICES FOR THE MEDICINE BOW AND ROUTT NF - TROUBLESOME BOUNDARY POSTING PROJECT 1 AND MULLEN BOUNDARY PROJECTS 2 AND 3.
FY 2022 ROAD SURFACE CONDITION SURVEYS MOD 2- THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO ADD GRAVEL PIT TEST HOLE OBSERVATIONS, TESTING AND RECOMMENDATIONS NO OTHER CHANGES ARE BEING MADE AT THIS TIME. MOD 1- THE PURPOSE OF THIS MODI
MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR ARCHITECTURAL AND ENGINEERING SERVICES FOR THE DEPARTMENT OF INTERIOR AND FOREST SERVICE
CONT AE FISHLAKE SO ASBESTOS SURVEY
UPPER RIO PUEBLO BRIDGE REPAIR - A/E TASK ORDER TO GET APPROPRIATE DESIGN COMPLETED FOR FIXING THE BRIDGE
Business Details
- UEI
- NNEZA6L8DSK8
- CAGE Code
- 5K774
- Address
- 2484 WASHINGTON BLVD STE 510
OGDEN, UT 844012346 - Congressional District
- UT-01
- Phone
- 8013995821
Parent Company
CASE, LOWE & HART, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.