C J W CONSTRUCTION, INC.
SANTA ANA, CALIFORNIA 927013878
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 237990 | $24.01M | 48 |
| 237110 | $1.60M | 5 |
| 237310 | $995K | 5 |
Contract Awards
40 awards found
DEOBLIGATE MINIMUM GUARANTEE
CONTRACT FOR LOWER NORCO BLUFFS, NORCO, CA NO. R00033 WN034 TITLE: EV STA ,STEEL DR, SPEED BUMPS, HVAC. TOTAL CONTRACT PRICE INCREASED BY $33,089.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
ADD APPROXIMATELY 34,000 SF OF GUNITE REPAIR WORK TO INCREASE THE PROJECT REPAIR TOTAL FROM 60,000 SF TO THE SQUARE FOOTAGE AS NEEDED (APPROXIMATELY 94,000 SF) TO COMPLETE FULL SCOPE OF REPAIR WORK.
CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT, SUPERVISION, ETC. TO REPAIR WATER STORAGE TANK 1 AND INLET PIPE AND INCIDENTAL RELATED WORK AT BUILDING 761 IN ACCORDANCE WITH THE SCOPE OF WORK, DRAWINGS, AND SPECIFICATIONS HEREIN AT NAS LEMOORE CA
CONTRACT FOR LOWER NORCO BLUFFS, NORCO, CA REFERENCE NO. R00032 WN032 REMOTE GATES AND SPEED BUMPS. TOTAL CONTRACT PRICE IS INCREASED BY $101,438.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR LOWER NORCO BLUFFS, NORCO, CA REFERENCE NO. R00031 WN031 PRADO OFFICE MAINTENANCE & SEC GUARD. TOTAL CONTRACT PRICE IS INCREASED BY $314,196.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR LOWER NORCO BLUFFS, PRADO AM FLOOD CONTROL AT NORCO, CA. REFERENCE NO. R00030 WN030 FINAL QTY CLINS 2,7-22, 46. TOTAL CONTRACT PRICE IS INCREASE BY $222,377.84. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
REPAIR BRIDGE 450 POINT MUGU
OBLIGATE MINIMUM GUARANTEE
SANTA ANA WATERSHED PERMIT FOR LOWER NORCO BLUFFS, PRADO AM FLOOD CONTROL BASIN NO. R00028 WN028 SANTA ANA WATERSHED PERMIT. TOTAL CONTRACT PRICE IS INCREASED BY $16,288.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
MINIMUM GUARANTEE/ HH MACC
X002 NAWS0423-MILCON REPAIR MILCON ROADS DAMAGE BY MILCON TRAFFIC
CONTRACT FOR LOWER NORCO BLUFFS, PRADO DAM FLOOD CONTROL BASIN AT NORCO, CA. REF NO. R00029 WN029 FINAL QTY CLN 9,15,18. TOTAL CONTRACT PRICE IS INCREASED BY $239,488.08. CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
NAWS0423-MILCON REPAIR MILCON ROADS DAMAGE BY MILCON TRAFFIC
D5500833 MAGAZINE REPAIRS FOR MULTIPLE MAGAZINES
CONTRACT FOR LOWER NORCO BLUFFS, PRADO AM FLOOD CONTROL BASIN AT NORCO, CA. NO. R00027 INSTALL 240 OUTLET & 2 GARBAGE DISPOSAL. TOTAL CONTRACT PRICE IS INCREASED BY $9,681.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR LOWER NORCO BLUFFS AT NORCO, CA. NO. R00026 WN025 INTERIM QUANTITY INCREASE FOR CLIN 0015. TOTAL CONTRACT PRICE IS INCREASED BY $246,000.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
X002 NAWS0304 REPAIR MAIN ECP DRAINAGE, FAC. 00986
CONTRACT FOR LOWER NORCO BLUFFS, PRADO AM FLOOD CONTROL BASIN AT NORCO, CA. REF NO. R00024 WN022 CONCRETE CURB INSTALLATION. TOTAL CONTRACT PRICE IS INCREASED BY $12,420.00. CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR LOWER NORCO BLUFFS, PRADO AM FLOOD CONTROL BASIN AT NORCO, CA. REF NO. R00025 WN026 REPLACE DAMAGED WATER HEATER (LAB). TOTAL CONTRACT PRICE IS INCREASED BY $1,551.00. CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR LOWER NORCO BLUFFS, PRADO AM FLOOD CONTROL BASIN AT NORCO, CA. REF NO. R00022 WN020 CLIN 0015 QUANTITY INCREASE. TOTAL CONTRACT PRICE IS INCREASED BY $246,400.00. CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
CONTRACT FOR LOWER NORCO BLUFFS, PRADO DAM FLOOD CONTROL BASIN AT NORCO, CA. REFERENCE NO. R00023 WN023 GROUT EDGE OF 42" RIP RAP AT ROADSIDE. TOTAL CONTRACT PRICE IS INCREASED BY $153,456. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED.
CONTRACT FOR LOWER NORCO BLUFFS, PRADO DAM FLOOD CONTROL BASIN AT NORCO, CA. REFERENCE NO. R00021 WN024 PEST CONTROL SERVICES. TOTAL CONTRACT PRICE IS INCREASED BY $6,813.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
DE-OBLIGATE MINIMUM GUARANTEE
CONTRACT FOR LOWER NORCO BLUFFS. PRADO DAM FLOOD CONTROL BASIN AT NORCO, CA. REFERENCE NO. R00020 WN021 LOAD CENTER/PANELBOARD TEST. TOTAL CONTRACT PRICE IS INCREASED BY $2,891.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED.
CONTRACT FOR LOWER NORCO BLUFFS, PRADO DAM FLOOD CONTROL BASIN AT NORCO, CA. REFERENCE NO. R00019 WN018 MODIFICATION TO UPSTREAM TERMINUS. TOTAL CONTRACT PRICE IS INCREASED BY $248,987.95. CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED.
CONTRACT FOR LOWER NORCO BLUFFS, PRADO DAM FLOOD CONTROL BASIN AT NORCO, CA. REFERENCE NO. R00018 WN019 REPAIRS DECKING AND REPLACE FLOOR JOISTS. TOTAL CONTRACT PRICE IS INCREASED BY $7,747.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED.
CONTRACT FOR LOWER NORCO BLUFFS, PRADO DAM FLOOD CONTROL BASIN AT NORCO, CA. R00017 WN017 MAINTENANCE & SECURITY GUARD. TOTAL CONTRACT PRICE IS INCREASED BY $348,371.94. CONTRACT COMPLETION DATE SHALL BE EXTENDED BY 376 CALENDAR DAYS (DEC 31, 2024).
CONTRACT FOR LOWER NORCO BLUFFS, PRADO DAM FLOOD CONTROL BASIN AT NORCO, CA. REFERENCE NO. R00015 WN014 REPAIRS TO DECKING AND ROOF. TOTAL CONTRACT PRICE IS INCREASED BY $3,430.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED.
CONTRACT FOR LOWER NORCO BLUFFS, PRADO DAM FLOOD CONTROL BASIN AT NORCO, CA. REFERENCE NO. R00014 WN015 CLIN 0012 AND CLIN 0013 QTY INCREASE. TOTAL CONTRACT PRICE IS INCREASED BY $339,756.40. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED.
CONTRACT FOR LOWER NORCO BLUFFS, PRADO DAM FLOOD CONTROL BASIN AT NORCO, CA. REFERENCE NO. R00012 WN012 CLIN 0006 AND 0017 QTY CHANGES. TOTAL CONTRACT PRICE IS INCREASED BY $74,186.39. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED.
CONTRACT FOR LOWER NORCO BLUFFS, PRADO DAM FLOOD CONTROL BASIN AT NORCO, CA. REFERENCE NO. R00011 WN011 INSTALL 240 OUTLET & REPAIR DECKING. TOTAL CONTRACT PRICE IS INCREASED BY $10,575.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED.
CONTRACT FOR LOWER NORCO BLUFFS, PRADO DAM FLOOD CONTROL BASIN AT NORCO, CA. REFERENCE NO. R00010 WN009 INSTALL ADDITIONAL COLLAR AT SD2. TOTAL CONTRACT PRICE IS INCREASED BY $15,592. CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED.
CONTRACT FOR LOWER NORCO BLUFFS, PRADO AM FLOOD CONTROL BASIN AT NORCO, CA. R00008 WN008 QTY CHANGES CLIN 0006, 0009, 0012, 0013. TOTAL CONTRACT PRICE IS INCREASED BY $497,400. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION
OBLIGATION OF $5000 MINIMUM GUARANTEE
X001 D52S0121 PATCH AND REPAIR RANDSBURG RD.
CONTRACT FOR LOWER NORCO BLUFFS, PRADO DAM FLOOD CONTROL BASIN AT NORCO, CA. REFERENCE NO. R00005 WN005 INTERIM QTY INCREASE CLIN 013. TOTAL CONTRACT PRICE IS INCREASED BY $249,400.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED.
CONTRACT FOR LOWER NORCO BLUFFS, PRADO DAM FLOOD CONTROL BASIN AT NORCO, CA. REFERENCE NO. R00007 WN007 INCREASE IN QTY CLIN 13. TOTAL CONTRACT PRICE IS INCREASED BY $249,400.00. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED.
CONTRACT FOR LOWER NORCO BLUFFS, PRADO DAM FLOOD CONTROL BASIN AT NORCO, CA. REFERENCE NO. R00006 WN006 WEEP HOLE DESIGN CHANGE. TOTAL CONTRACT PRICE IS INCREASED BY $52,363.00. CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED.
CONTRACT FOR LOWER NORCO BLUFFS,PRADO AM FLOOD CONTROL BASIN AT NORCO,CA. REFERENCE NO. R00003 WN003 INTERIM INCREASE FOR CLIN013. TOTAL CONTRACT PRICE INCREASED BY $249,400. THE CONTRACT COMPLETION DATE SHALL REMAIN UNCHANGED BY THIS MODIFICATION.
Business Details
- UEI
- MY4DNWXWL7M1
- CAGE Code
- 3DZL9
- Address
- 841 E WASHINGTON AVE STE B
SANTA ANA, CA 927013878 - Congressional District
- CA-46
- Phone
- 7148356820
Parent Company
C J W CONSTRUCTION, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov