ALLIED ENGINEERING SERVICES INC
BOZEMAN, MONTANA 597186958
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541330 | $1.17M | 56 |
| 541990 | $279K | 13 |
| 115310 | $147K | 5 |
| 541620 | $0 | 1 |
| 541380 | $-48,635.55 | 1 |
Contract Awards
47 awards found
0413 SERV REGION 4 STREAM HABITAT, HYDROLOGY, DIVERSION SURVEY - TASK ORDER THIS TASK ORDER IS SPECIFIC TO THE FOLLOWING TASKS: 1) FIELD WORK ON 66 DIVERSION SITES; 2) UPDATE 5 GAGE WORKBOOKS AND PREPARE SUMMARY WORKBOOK SIMILAR TO TASK ORDER I OUTP
PPS NWZ ARCHITECTURE AND ENGINEERING (AE) IDIQ
LOWER RED ROCKS LAKE DAM GEOTECHNICAL INVESTIGATION, MONTANA
TASK ORDER FOR TBD IDIQ-SERVICE, 0413 SERV REGION 4 STRAM HABITAT, HYDROLOGY, DIVERSION SURVEY,
IRA - SOUTH HILLS NOXIOUS WEED INVENTORY
THE USFS REGION 1 DAM SAFETY PROGRAM IS LOOKING FOR GENERAL ENGINEERING SUPPORT. QUALIFICATIONS: THE CONTRACTOR SHALL PROVIDE STAFF WITH EXPERTISE IN EARTHEN DAM ENGINEERING, GEOTECHNICAL, ENVIRONMENTAL, AND HYDRAULIC/HYDROLOGICAL ENGINEERING, AND WE
PROVIDE GEOTECH, DAMS, TUNNELS AND PAVEMENT DESIGN, INVESTIGATION, MATERIALS, AND TESTING SUPPORT TO REGIONWIDE
CONJECTURE DAM DECOMMISSIONING DESIGN PACKAGE
DRILL A SERIES OF HORIZONTAL DRAINS TO DIVERT GROUNDWATER AND RELIEVE EXCESS PORE WATER PRESSURES ADJACENT TO THE BEAL LEACH PAD FACILITY.
ALLIED GEOTECHNICAL ENGINEERING SUPPORT, MODIFICATION P00003 ADDING TIME AND SERVICES TO ONGOING WORK.
SD-MADISON WMD-GAOA-GEOTECH BOARDWK SURV
PROJECT I: STREAM GAGE WORK PROJECT II: DIVERSION CONDITION ASSESSMENTS PROJECT III: STANLEY CREEK AQUATIC ORGANISM PASSAGE DESIGN
YELL WETLAND AND RARE PLANT SURVEY
SD-MADISON WMD-GAOA-GEOTECH BOARDWK SURV
TASK ORDER FOR TBD IDIQ-SERVICE, 0413 SERV REGION 4 STRAM HABITAT, HYDROLOGY, DIVERSION SURVEY,
IRA - SOUTH HILLS NOXIOUS WEED INVENTORY
THE STREAMS TO BE SURVEYED INCLUDE STONE CREEK TRIBUTARY 1, MIDDLE OAK GROVE FORK, TYGH CREEK, JORDAN CREEK, AND SEVERAL OTHERS AS POTENTIAL ALTERNATIVES DEPENDING ON FUNDING. (SEE MAP AND TABLE AT END OF DOCUMENT). DUE TO THE UNPREDICTABLE NATURE OF
NZCLR UPPER BEAR LAKE DECOMMISSIONING/RESTORATION DESIGN WORK INVOLVES DEVELOPING A FINAL SET OF PLANS, SPECIFICATIONS, AND COST ESTIMATE FOR THE PERMANENT DECOMMISSIONING OF UPPER BEAR LAKE DAM.
IPNF COPPER CREEK DAM DECOMMISSIONING AND REHABILITATION DESIGN
MYRTLE CR., SMITH CR., CLARKIA, AND AVERY DAMS ARE LOCATED ON THE IDAHO PANHANDLE NATIONAL FOREST. THE CONTRACTOR SHALL CONDUCT A DETAILED O&M INSPECTION AND HAZARD ANALYSIS OF THESE FOUR DAMS/DAM COMPLEXES. THIS WORK WILL INCLUDE EVALUATING PAST
PROJECT I: STREAM GAGE WORK PROJECT II: DIVERSION CONDITION ASSESSMENTS PROJECT III: STANLEY CREEK AQUATIC ORGANISM PASSAGE DESIGN
2022 INSTREAM FLOW MEASUREMENT, ANALYSIS AND REPORTING SERVICES-ALLIED ENGINEERING BPA CONTRACT # BPA1284M818A0001
PURPOSE OF MODIFICATION IS TO ADD ADDITIONAL FUNDING FOR AN ITEM PART 2 TASK 4-STREAM GAGE DATA DEVELOPMENT THAT WAS NOT QUOTED ON THE ORIGINAL PROPOSAL. 2021 INSTREAM FLOW MEASUREMENT, ANALYSIS AND REPORTING SERVICES
MODIFICATION 0001 TO TASK ORDER FOR PHASE II - ALLISON AND ERICSON DAM COMPLEXES DECOMMISSIONING/RESTORATION DESIGN IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE.
CONJECTURE DAM DECOMMISSIONING DESIGN PACKAGE
DRILL A SERIES OF HORIZONTAL DRAINS TO DIVERT GROUNDWATER AND RELIEVE EXCESS PORE WATER PRESSURES ADJACENT TO THE BEAL LEACH PAD FACILITY.
IIJA - THIS TASK ORDER HAS A BASE BID FOR THE TUNNEL INSPECTION AND REPORT; LIDAR SCANNING, PROCESSING, AND ANALYSIS OF THE TUNNEL; AND INSTALLATION OF PERMANENT STATIONING PLACARDS IN THE TUNNELS. IT ALSO INCLUDES AN UNFUNDED OPTION ITEM FOR THE IN
PROVIDE GEOTECH, DAMS, TUNNELS AND PAVEMENT DESIGN, INVESTIGATION, MATERIALS, AND TESTING SUPPORT TO REGIONWIDE
PROJECT I: STREAM GAGE WORK PROJECT II: DIVERSION CONDITION ASSESSMENTS PROJECT III: STANLEY CREEK AQUATIC ORGANISM PASSAGE DESIGN
THE USFS REGION 1 DAM SAFETY PROGRAM IS LOOKING FOR GENERAL ENGINEERING SUPPORT. QUALIFICATIONS: THE CONTRACTOR SHALL PROVIDE STAFF WITH EXPERTISE IN EARTHEN DAM ENGINEERING, GEOTECHNICAL, ENVIRONMENTAL, AND HYDRAULIC/HYDROLOGICAL ENGINEERING, AND WE
RILEY PASS SEDIMENT POND CLEANOUT ENGINEERING DESIGN AND CONSTRUCTION PERIOD SERVICES, MODIFICATION TO DE-OBLIGATE EXCESS FUNDS TO FACILITATE CONTRACT CLOSEOUT
DUE TO THE RECENT RECLASSIFICATION OF THE DAM, THE ANTICIPATED INCREASE IN INSPECTION AND MAINTENANCE COSTS, AND LINGERING CONCERNS ABOUT THE OVERALL INTEGRITY OF THE DAM, THE USFS IS INTERESTED IN CONDUCTING A DETAILED RISK AND BENEFITS EVALUATION O
MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR GEOTECHNICAL ENGINEERING SERVICES FOR THE DEPARTMENT OF INTERIOR AND FOREST SERVICE
IT IS THE INTENT OF THE USFS TO REMOVE THE ENTIRETY OF THE DAM DOWN TO ~ ELEV. 5335 (SEE FIGURE 1 BELOW) AND REMOVE ALL UNACCEPTABLE MATERIAL SUCH AS UNSUITABLE SOILS, LARGE BOULDERS AND ROCKS, AND REMNANTS OF THE ORIGINAL WOODEN HEADWALL AND CULVERT
TASK ORDER FOR PHASE II - ALLISON AND ERICSON DAM COMPLEXES DECOMMISSIONING/RESTORATION DESIGN WORK.
MODIFICATION P0005 IS ADMINISTRATIVE TO COMPLETE FINAL CLOSE-OUT. DE-OBLIGATE $4560 IN EXCESS FUNDING NOT USED.
LAKE ANDES NWR GEOTECH INVESTIGATION
HIAWATHA TRAIL GROUND-BASED LIDAR SCANNING TUNNELS AND SNOWSHEDS, IPNF GEOTECH TO AWARD
HIAWATHA TRAIL TUNNEL INSPECTION, IPNF
CHANGE CO FROM JEFF GARDNER TO LISA RAKICH.
DRILL A SERIES OF HORIZONTAL DRAINS TO DIVERT GROUNDWATER AND RELIEVE EXCESS PORE WATER PRESSURES ADJACENT TO THE BEAL LEACH PAD FACILITY.
MT-BENTON LAKE NWR-STRUCTURAL ANALYSIS
STONEWALL AGGREGATE STOCKPILE ANALYSIS. MODIFICATION P00002
THE KOOTENAI NATIONAL FOREST WANTS TO MAP A SECTION OF THE BEAVER CREEK STREAM CHANNEL AND SURROUNDING RIPARIAN AREA. THE SITE IS APPROXIMATELY, 1,500 METERS LONG AND 500 METERS WIDE, AMOUNTING TO ROUGHLY 150 ACRES. THE COLLECTED DATA WILL BE USED FO
SATHER DAM REHABILITATION DESIGN ON THE DAKOTA PRAIRIE NATIONAL GRASSLANDS UNDER REGION 1 A&E SERVICES IDIQ GEOTECHNICAL SERVICES.
MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR GEOTECHNICAL ENGINEERING SERVICES FOR THE DEPARTMENT OF INTERIOR AND FOREST SERVICE
ALLISON CREEK AND ERICKSON DAMS ARE TWO COMPLEXES LOCATED ON THE NEZ PERCE CLEARWATER NATIONAL FORESTS. THIS FEASIBILITY STUDY IS INTENDED TO BE PART 1 OF THE INITIAL PHASE OF A MULTI-YEAR DECOMMISSIONING WORK.
Business Details
- UEI
- LYARYWD1YSZ1
- CAGE Code
- 1GHU7
- Address
- 32 DISCOVERY DR
BOZEMAN, MT 597186958 - Congressional District
- MT-01
- Phone
- 4065820221
Parent Company
ALLIED ENGINEERING SERVICES INC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov