ROCK-N-ROAD CONSTRUCTION, INC.
PETERSBURG, ALASKA 998330000
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 237310 | $10.34M | 45 |
| 237990 | $3.59M | 20 |
| 115310 | $131K | 1 |
| 212321 | $119K | 1 |
| 238910 | $33K | 1 |
| 561790 | $20K | 19 |
Contract Awards
50 awards found
ADDITIONAL D1 AND BASE COURSE NEEDED TO MEET GRADES OF THE EXISTING ROAD STRUCTURE. EXTEND THE POP.
SNOW PLOW AND SANDING SERVICES FOR HARRIS BUILDING PARKING LOT. 1240BF22D0030 WPAP 716865
1005 EAM CONST WRD PHASE 2 ZAREMBO ISLAND BOAT LAUNCH- ST JOHNS BRIDGE- ROAD 6590 ROAD RECONSTRUCTION, CULVERT INSTALLATION, AND SURFACING ON ZAREMBO ISLAND. THE WORK WILL CONSIST OF ROADWAY RECONDITIONING, CULVERT INSTALLATION, THE DEVELOPMENT OF A
ADDITIONAL D1 AND BASE COURSE NEEDED TO MEET GRADES OF THE EXISTING ROAD STRUCTURE. EXTEND THE POP.
GAOA TONGASS DOCKS AND MARINE INFRASTRUCTURE REPAIRS: FALSE ISLAND REMOTE DOCK
PSG SNOWPLOWING & SANDING HOUSING COMPOUND
GAOA HOONAH ROAD, AOP IMPROVEMENTS & BRIDGE RECON: 8502 MP 3.478 BRIDGE; REMOVAL OF EXISTING BRIDGE AND CONSTRUCTION OF NEW 69' BRIDGE AND ABUTMENTS; RECONSTRUCTION OF ROAD FOR BRIDGE CONSTRUCTION
GAOA HOONAH ROAD, AOP IMPROVEMENTS & BRIDGE RECON: 8502 MP 1.986 BRIDGE: HOONAH DOUBLE LANE BRIDGES PHASE TWO. REPLACE THE SINGLE LANE BRIDGE AT 8502 MP 1.986 WITH A LONGER DOUBLE LANE BRIDGE
CRD ROCK CRUSHING
GAOA TONGASS DOCKS AND MARINE INFRASTRUCTURE REPAIRS: FALSE ISLAND REMOTE DOCK
GAOA TONGASS DOCKS AND MARINE INFRASTRUCTURE REPAIRS: KMRD REMOTE DOCK
TBRD UPPER STEELHEAD ROAD STORAGE AND DECOMMISSIONING
GAOA TONGASS NF DOCK: SITKA AND PETERSBURG MARINE FACILITIES MOD 7: INSTALL ADA HANDRAIL AND EXTEND PERIOD OF PERFORMANCE.
1005 EAM CONST WRD PHASE 2 ZAREMBO ISLAND BOAT LAUNCH- ST JOHNS BRIDGE- ROAD 6590 ROAD RECONSTRUCTION, CULVERT INSTALLATION, AND SURFACING ON ZAREMBO ISLAND. THE WORK WILL CONSIST OF ROADWAY RECONDITIONING, CULVERT INSTALLATION, THE DEVELOPMENT OF A
IIJA/BIL FALSE ISLAND AQUATIC ORGANISM PASSAGE RECONSTRUCTION: : THE PURPOSE OF THIS TASK ORDER FROM THE TONGASS MATOC (AOP) CONSTRUCTION PARENT CONTRACT IS TO REPLACE 2 UNDERSIZED CORRUGATED METAL PIPES WITH AOP DESIGNED STRUCTURES ON NFS ROAD 7540F
PRD MITKOF ISLAND BRIDGE RESURFACING
2024 POW SHAHEEN STANEY AOP- THE PURPOSE OF THIS TASK ORDER FROM THE REGION 10 MATOC (AOP) CONSTRUCTION PARENT CONTRACT IS TO (1) REPLACE 1 UNDERSIZED CORRUGATED METAL PIPE WITH AN AOP DESIGNED CULVERT ON NFS ROAD 2050300 MP 4.67, TO (2) PLACE 300 CY
PSG HARRIS BLG SNOWPLOWING & SANDING
GAOA - WORK IS TO IMPROVE THREE CAMPSITES AND ACCESS ROAD DEVELOP ADDITIONAL PARKING INSTALL PAY STATION, 1 VAULT TOILET, 1 DAY USE PICNIC SHELTER AND RELATED AMENITIES, AND REPAIR EXISTING DOCK FACILITIES.
BACKLOOP ROAD RECONDITIONING; COMPLETE RECONDITIONING OF 5.15 MILES OF ROADWAY. THIS PROJECT WILL ALSO INVOLVE DEVELOPING A MATERIAL SOURCE, CRUSHING, HAULING, PLACING AND COMPACTION OF SURFACE BASE AGGREGATE AND INSTALLING MULTIPLE NEW CULVERTS.
PSBG OFFICE SNOWPLOWING & SANDING
TASK ORDER FOR PSBG OFFICE AND QTRS COMPLEX SNOWPLOWING & SANDING
PSG PDO SNOWPLOW
DEWATERING, EXCAVATION, ROCK EXCAVATION, INSTALLATION OF STRUCTURES, DEVELOPMENT OF QUARRY, BORROW MATERIAL FROM NEARBY QUARRY FOR MATERIAL, HAUL, RECONSTRUCTING STREAMBED AND BANKS WITH INSTREAM ROCK STRUCTURES, BACKFILL, AND SOIL EROSION CONTROL
TONGASS NATIONAL FOREST - GAOA ROOSEVELT HARBOR DOCK REPAIR MOD2 - INSTALL, REMOVAL AND REPLACEMENT OF DECKING MATERIALS.
GAOA TONGASS NF DOCK: SITKA AND PETERSBURG MARINE FACILITIES MOD 1: CHANGE CO FROM JANET PAUL TO MAI MOUA. USE OF LUMBER IN LIEU OF COMPOSITE. EXTEND THE PERIOD OF PERFORMANCE TO JULY 30, 2024.
GAOA TONGASS NF DOCK: WRANGELL MARINE FACILITY
IIJA/BIL FALSE ISLAND AQUATIC ORGANISM PASSAGE RECONSTRUCTION: : THE PURPOSE OF THIS TASK ORDER FROM THE TONGASS MATOC (AOP) CONSTRUCTION PARENT CONTRACT IS TO REPLACE 2 UNDERSIZED CORRUGATED METAL PIPES WITH AOP DESIGNED STRUCTURES ON NFS ROAD 7540F
MINIMUM GUARANTEES FOR R10 ROAD CONSTRUCTION MATOC IDIQ MODIFICATION TO CANCEL ORDER AND DEOBLIGATE MINIMUM GUARANTEE AS GUARANTEE HAS BEEN MET ON OTHER ORDERS.
PSG PDO SNOWPLOW
BACKLOOP ROAD RECONDITIONING; COMPLETE RECONDITIONING OF 5.15 MILES OF ROADWAY. THIS PROJECT WILL ALSO INVOLVE DEVELOPING A MATERIAL SOURCE, CRUSHING, HAULING, PLACING AND COMPACTION OF SURFACE BASE AGGREGATE AND INSTALLING MULTIPLE NEW CULVERTS.
GAOA HOONAH ROAD, AOP IMPROVEMENTS & BRIDGE RECON: 8502 MP 1.986 BRIDGE: HOONAH DOUBLE LANE BRIDGES PHASE TWO. REPLACE THE SINGLE LANE BRIDGE AT 8502 MP 1.986 WITH A LONGER DOUBLE LANE BRIDGE
PSBG OFFICE SNOWPLOWING & SANDING
TONGASS NATIONAL FOREST - GAOA ROOSEVELT HARBOR DOCK REPAIR
IIJA/BIL FALSE ISLAND AQUATIC ORGANISM PASSAGE RECONSTRUCTION: : THE PURPOSE OF THIS TASK ORDER FROM THE TONGASS MATOC (AOP) CONSTRUCTION PARENT CONTRACT IS TO REPLACE 2 UNDERSIZED CORRUGATED METAL PIPES WITH AOP DESIGNED STRUCTURES ON NFS ROAD 7540F
BACKLOOP ROAD RECONDITIONING; COMPLETE RECONDITIONING OF 5.15 MILES OF ROADWAY. THIS PROJECT WILL ALSO INVOLVE DEVELOPING A MATERIAL SOURCE, CRUSHING, HAULING, PLACING AND COMPACTION OF SURFACE BASE AGGREGATE AND INSTALLING MULTIPLE NEW CULVERTS.
TONGASS NATIONAL FOREST: RUSH PEAK BRIDGE CONSTRUCTION.
THE PURPOSE OF THIS MODIFICATION IS TO: 1. INCREASE TOTAL QUANTITIES IN OPTION 01 FROM 10CY TO 40CY. 2. INCREASE TOTAL CONTRACT FUNDING BY $6,000.00. ALL OTHER CONTRACT TERMS AND CONDITIONS REMAIN UNCHANGED.
GAOA HOONAH ROAD, AOP IMPROVEMENTS & BRIDGE RECON: 8502 MP 3.478 BRIDGE; REMOVAL OF EXISTING BRIDGE AND CONSTRUCTION OF NEW 69' BRIDGE AND ABUTMENTS; RECONSTRUCTION OF ROAD FOR BRIDGE CONSTRUCTION
AOP CULVERT REPLACEMENT NFSR 2030790 MP 1.08
TONGASS NATIONAL FOREST - GAOA ROOSEVELT HARBOR DOCK REPAIR
GAOA PRINCE OF WALES ISLAND POLK ROAD AOP 2100 MP 12.53 IS A NEW CONSTRUCTION CONTRACT ACTION WHICH ENTAILS THE REMOVAL AND DISPOSAL OF AN EXISTING CMP ON ROAD 2100 MP 12.53 AND REPLACE WITH A 60' LENGTH STEEL MODULAR BRIDGE. RECONSTRUCTING THE
GAOA TONGASS NF DOCK: SITKA AND PETERSBURG MARINE FACILITIES
GAOA ZAREMBO ISLAND BOAT LAUNCH, ROAD RECONSTRUCTION, AOPS & ST JOHNS BRIDGE- ST JOHNS BRIDGE REPLACEMENT- REPLACE A 80' BRIDGE WITH A 112 ' BRIDGE ON ROAD 6290 AT MP1.1
HOONAH ERFO AOP STREAM CROSSING IMPROVEMENTS
GAOA TONGASS NF DOCK: WRANGELL MARINE FACILITY
POW STORM DAMAGE ROAD REPAIRS CONSISTS OF PERFORMING URGENT ROAD REPAIRS TO STORM DAMAGED ROADS TO RECONDITION EXISTING DITCHES AND CULVERTS, REPAIR ROAD SURFACES, HAULING & PLACING SURFACE AGGREGATES, NEW CULVERT INSTALLATION, SLIDE DEBRIS REMOV
MINIMUM GUARANTEES FOR R10 ROAD CONSTRUCTION MATOC IDIQ
TASK ORDER FOR PSBG OFFICE AND QTRS COMPLEX SNOWPLOWING & SANDING
STANEY CREEK AQUATIC ORGANISM PASSAGE CONSTRUCTION CONSISTS OF REMOVING EXISTING CULVERTS ON ROAD 2050 AT MP 10.36 AND 14.69 AND REPLACE WITH A NEW DESIGNED AQUATIC ORGANISM PASSAGE STRUCTURE AND THE CONSTRUCTION OF A NEW SIMULATED STREAMBED.
Business Details
- UEI
- LP4KLHJQHD94
- CAGE Code
- 1SSX8
- Address
- 200 HUNGERFORD HILL RD
PETERSBURG, AK 998330000 - Congressional District
- AK-00
- Phone
- 9077723308
Parent Company
ROCK-N-ROAD CONSTRUCTION, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov