BARNARD CONSTRUCTION COMPANY, INCORPORATED
DBA: BARNARD CONSTRUCTION CO INC
BOZEMAN, MONTANA 597152453
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 237990 | $353.22M | 91 |
| 237130 | $2.27M | 4 |
| 237310 | $500K | 1 |
| 236220 | $0 | 1 |
Contract Awards
50 awards found
MORATORIUM EXCEPTION" BLI DDVAK725 HURRICANE HELENE VCT DISASTER RECON DESIGN-BUILD ATTACHMENT 007, SECTION L, ITEM K (2)(B) PROPOSAL EXPENSE AND PRE-AWARD COSTS
MOTION MONITORING SYSTEM INSTALLATION SERVICES
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R20041 TERM S-SLIDE IMPACT COSTS (NTE) PART-2
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R10041 TERM S-SLIDE IMPACT COSTS (NTE) PART-1
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R40035 TERMINAL STRUCTURE SLIDE PART-5 FINAL
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00025 DOWNSTREAM (DS) TERMINAL STRUCTURE SLIDE
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00031 DOWNSTREAM CUTOFF WALL EXCAVATION
WHITTIER NARROWS DAM IS OWNED BY THE FEDERAL GOVERNMENT AND OPERATED AND MAINTAINED BY THE USACE LOS ANGELES DISTRICT (SPL) AND IS 11 MILES EAST OF DOWNTOWN LOS ANGELES.
PRADO DAM SPILLWAY MODIFICATION PROJECT IN RIVERSIDE COUNTY, CALIFORNIA / CALIFORNIA MEGA PROJECTS OFFICE (CAMPO) FPIS CONTRACT TYPE, UTILIZING THE IDAC APPROACH.
THIS TASK ORDER (T.O.) FOR THIS INDEFINITE DELIVERY CONTRACT (IDC) AWARDED UNDER SOLICITATION W912HY21R0012. THE MINIMUM GUARANTEE AMOUNT IS $2,500.00 FOR EACH IDC AWARDED UNDER THE MATOC IAW FAR CLAUSE 52.216-19.
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R20035 TERMINAL STRUCTURE SLIDE (NTE) PART-4
CONTRACT FOR FY25 THREE RIVERS PHASE 2 REFERENCE NO. R00001 CC001 BENZAL ROAD IMPROVEMENTS
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00040 FULL TIME QC PERSONNEL 2025
DESIGN-BID-BUILD OF THREE RIVERS PHASE 2 HYDRAULIC CONTAINMENT STRUCTURE AND MODIFICATIONS TO OWENS LAKE AND LA GRUES LAKE CULVERTS. WORK WILL INCLUDE, BUT NOT LIMITED TO, ACTIVITIES SUCH AS CLEARING, GRUBBING, EXCAVATION AND HAUL ROADS.
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00034 RCC APRON & CUTOFF WALL CRACK MITIGATION
PIPESTEM SPILLWAY MODIFICATION PROJECT - R00039 RCC SECONDARY SECT FREEZE THAW BEAMS
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R20035 TERMINAL STRUCTURE SLIDE (NTE) PART-3
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R10022 RCC FORMED FACES, PART-2
THE PURPOSE OF THIS MODIFICATION (P00009) IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE FOR ADDITIONAL AIRFLOW SPOILERS AS PART OF THE ESTES-FLATIRON 115KV DOUBLE CIRCUIT REBUILD PROJECT.
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00038 SOIL CEMENT AGGREGATE
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R10035 TERMINAL STRUCTURE SLIDE (NTE) PART-2
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00023 DEWATERING WELL FOULING REMEDIATION
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00027 RIP RAP REV, ADD WATERSTOP AND RCC CLIN
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00016 ROCK IN EXCAVATED MATERIALS
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00035 TERMINAL STRUCTURE SLIDE (NTE) PART-1
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00026 FULL TIME QC PERSONNEL
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00032 INTERIM VEQ - GRAVEL (CLIN 0011)
EC- POLE HILL AFTERBAY REPAIR
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00010: TREE PLANTING DETAIL & R00028: DESTRUCTIVE RCC TESTING AND COARSE AGGREGATE SHIPMENT
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00022 RCC FORMED FACES PART-1 (NTE)
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00024 SURVEY LICENSES
EC- POLE HILL AFTERBAY REPAIR
THE PURPOSE OF THIS MODIFICATION IS A SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE.
CLAIM-002 PARTIAL MERIT ITEMS SETTLEMENT
EC- POLE HILL AFTERBAY REPAIR
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00017 OVER-EX UNSUITABLE MATERIALS
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00020 GOV OFFICE REV & R00021 ADD MATERIAL TESTING
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00018 RIFLE RANGE CLEANUP & ADDITIONAL RIPRAP
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R10015 RT ABUTMENT COULEE DRAINAGE SYSTEM FINAL-PART
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00013 MH COVERS, CONNECTION BOOTS, FLAP GATES
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00009 VEQ CLEARING AND GRUBBING
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00004 IN-WELL MOVEMENT & P-WELL ABANDONMENT
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00008 EXCAVATE BELOW 1430
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00015 RT ABUTMENT COULEE DRAINAGE SYSTEM PT-1
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00005 QA QC LABORATORY ADDITIONS
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00002 REDUNDANT VWPZS AND FLOW MEASURING EQPT
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00001 QA QC LABORATORY LOCATION
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00003 GOVERNMENT TRAILER FURNITURE
CD: PIPESTEM SPILLWAY MODIFICATION PROJECT - R00011 GROUNDBREAKING CEREMONY
MINIMUM GUARANTEE/ HH MACC
Business Details
- UEI
- LEGGW1TNMVC9
- CAGE Code
- 0BRU7
- Address
- 701 GOLD AVE
BOZEMAN, MT 597152453 - Congressional District
- MT-01
- Phone
- 4065861995
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov