ROBERT PECCIA & ASSOCIATES, INC.
HELENA, MONTANA 596018637
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541330 | $11.54M | 293 |
| 541370 | $226K | 6 |
Contract Awards
50 awards found
P00005 - BRIDGE DESIGN UPDATE.
WA NP OLYM 103(4), REHABILITATE SOL DUC VALLEY ROAD DE-OBLIGATION AND CLOSEOUT
A/E FOR MT DAR MULTI 2025(1), DEFENSE ACCESS ROADS DATA COLLECTION
MOD 005 - GAOA HOLLAND LAKE A/E DESIGN WASTEWATER LAGOON ADDED WORK DUE TO CHANGED CONDITION
CO BOR RIP 2025(1), BOR COLLECTION PAVEMENT AND PARKING LOT DATA COLLECTION.
TITLE I CONDITION ASSESSMENT & SCOPING SERVICES - EPPLETON HALL DRYDOCK - SAN FRANCISCO MARITIME NATIONAL HISTORIC PARK, CA - PMIS #335162 MODIFICATION P00002 IS TO REVISE THE SCOPE TO INCLUDE ADDED LABOR TO OVERLAY THE UT DATA ONTO THE 3D MOD
OR FS FREWN602 28(1), ROAD 28 RECONSTRUCTION SUBSURFACE EXPLORATION PROGRAM
PERFORM NSTM BRIDGE INSPECTIONS IN REGION 1
MT DAR MULTI 2023(1), DEFENSE ACCESS ROADS POP UPDATE 2023 - CLOSEOUT MODIFICATION
ADDS HISTORIC AMERICAN BUILDING SURVEY(HABS) TASKS.
PROFESSIONAL LAND SURVEYING SERVICES TO MAINTAIN PREVIOUSLY MARKED NATIONAL FOREST BOUNDARIES AND TO MAINTAIN AND RE-MONUMENT CORNER MONUMENTS DESTROYED BY THE HORSE GULCH FIRE.
ROUTINE BRIDGE INSPECTIONS. WORK INCLUDES BUT NOT LIMITED TO SCHEDULING, TRANSPORTATION, FIELD INSPECTION, REPORT WRITING, QUALITY CONTROL, UPLOADING INSPECTION RESULTS INTO INSPECT X BMS
THIS MODIFICATION ADDS HOURS TO MULTIPLE POSITIONS. REFERENCE SOW.
WPAP # 714739 TIMBER SALE PRECONSTRUCTION ROAD SURVEYS ON HELENA L&C FOREST
A/E DESIGN MT FLAP BROADWATER 2023(1) GOOSE BAY LANE
ID FLAP ADA 2019(1), WESTERN HERITAGE BYWAY, SWAN FALLS ROAD COMPLETE SURVEY AND LEGAL DESCRIPTIONS.
THIS LABOR HOUR ORDER IS FOR CONVERTING DESIGN PROJECTS FROM EEBACS TO MASTERWORKS.
GAOA - WILDERNESS GATEWAY WATER/WASTEWATER DESIGN - NEZCLEAR
PROFESSIONAL ENG TECHNICAL SERVICES - RPA - REGION 1 - "ON-CALL"
TITLE II AE SERVICES RELOCATE CALLVILLE BAY MARINA AND LAUNCH RAMP IN 2023
GAOA EXERCISE OPTION ITEM 1: DESIGN LAGOON LINER REPAIR GOVERNMENT PLANS TO EXERCISE AN OPTION ITEM WITHIN 60 DAYS AFTER RECEIPT OF THE BASE ITEMS. BASE ITEMS ACCEPTED ON 03/04/2025.
WA NP OLYM 103(4), REHABILITATE SOL DUC VALLEY ROAD A/E DESIGN SERVICES AND NEPA DOCUMENTATION.
MT DAR MALM 2025(1) DEFENSE ACCESS ROADS FY2025 DESIGN AND CONSTRUCTION SUPPORT THE NOT TO EXCEED AMOUNT IS $10,372.70. FINAL COMPLETION DATE FOR THE TASK ORDER, INCLUDING REVIEW/ACCEPTANCE OF DELIVERABLES AND SUBMISSION OF FINAL INVOICE AND CL
GAOA-A&E SERVICES - SHELL FALLS VISITOR CENTER PRIMARY POWER REPLACEMENT
THIS MODIFICATION EXTENDS THE COMPLETION DATE FROM JUNE 30, 2025, TO DECEMBER 31, 2025, AND INCREASES LABOR HOURS, PER THE STATEMENT OF WORK. ALL OTHER TERMS AND CONDITIONS REMAIN IN FULL FORCE AND EFFECT. THIS MODIFICATION REPRESENTS AN INCRE
WA NP OLYM 103(4), REHABILITATE SOL DUC VALLEY ROAD ADDS WETLANDS AND STREAMS DELINEATION AND REPORT DRAFT AND FINAL
AK PFH 58(1), NECK LAKE ROAD RECONSTRUCTION: NPOWI HWY. TO MARINE ACCESS FACILITY JCT. ENGINEERING SUPPORT DURING ADVERTISEMENT AND CONSTRUCTION
MT FLAP SILVER 2021(1), ROOSEVELT DRIVE SAFETY AND REALIGNMENT PROJECT REDUCTION OF GEOTECHNICAL SUPPORT AND ADDITION OF HYDRAULIC SERVICES
MT PRA GLAC 10(44), LAKE MCDONALD UTILITY REPLACEMENT DEOB AND CLOSEOUT
MT FLAP BLACKF 12(1), FLAP REHABILITATION TWO MEDICINE ROAD & MT NP GLAC 12(2), FLTP REHABILITATION OF TWO MEDICINE ROAD COMPLETE THE DESIGN AND NEPA DOCUMENTATION
MT DAR MALM 2026(1), DEFENSE ACCESS ROADS FY 2026 COMPLETING THE DESIGN AND NEPA DOCUMENTATION
MT DAR MALM 2026(1), DEFENSE ACCESS ROADS FY 2026 CONSULTANT TO ATTEND A DAR MEETING AT CENTRAL FEDERAL LANDS TO INCLUDE TRAVEL COSTS
MT NP LIBI 10(2), LITTLE BIGHORN BATTLEFIELD NATIONAL MONUMENT ENGINEERING SUPPORT DURING ADVERTISEMENT AND CONSTRUCTION
MT FLAP BOR 2980(1) SUN RIVER BRIDGE REPLACEMENT PROVIDES CONSTRUCTION SUPPORT SERVICES
MT DAR MALM 2024(1), DEFENSE ACCESS ROAD FY 2024 DEOB AND CLOSEOUT
DESIGN QUALITY CONTROL REVIEWS (2) QUALITY CONTROL (QC) REVIEWS OF THE PLANS, SPECIFICATIONS, ESTIMATES, AND OTHER PROJECT DEVELOPMENT DELIVERABLES
MT FLAP BOR 2980(1), SUN RIVER BRIDGE REPLACEMENT DEOB AND CLOSEOUT
ID FLAP CANYON MULTI(1), INDIANA AND ORCHARD SHARED ROADWAY DEOB AND CLOSEOUT
MT FLAP DOT 236(2), WINIFRED NORTH ADJUST THE SCHEDULE AND INCLUDES MODIFYING THE PREVIOUSLY APPROVED PS&E PACKAGE AND BREAKING THE PACKAGE INTO 3 SEPARATE BID SCHEDULES, WITH THE BASE SCHEDULE (~SCHEDULE A) DEVELOPED TO MATCH THE PROGRAMMED FUN
MT NP GLAC 14(5), MANY GLACIER ROAD LANDSLIDES INTERMEDIATE DESIGN PHASES AND CHANGES COR
MT DAR MALM 2023(1), DEFENSE ACCESS ROAD FY 2023 DEOB AND CLOSEOUT
MT NP LIBI 10(2), LITTLE BIGHORN BATTLEFIELD NATIONAL MONUMENT PHASE 1 DEOB AND CLOSEOUT
OR FS FREWN602 28(1), ROAD 28 RECONSTRUCTION GEOTECHNICAL INVESTIGATION AND 30% DESIGN
MT PRA GLAC 10(45), REHABILITATE FINAL 9.3 MILES OF THE GOING-TO-THE-SUN ROAD & REPLACE BRIDGE OVER MCDONALD CREEK DEOB AND CLOSEOUT
MT DAR 2022(1), DEFENSE ACCESS ROAD FY 2022 DEOB AND CLOSEOUT
MT NP GLAC 12(2), FLTP REHABILITATION OF TWO MEDICINE ROAD DEOB AND CLOSEOUT
REGIONS 1 AND 2 HAVE NON REDUNDANT STEEL TENSION MEMBER (NSTM) BRIDGES AND DIFFICULT TO INSPECT BRIDGES THAT HAVE INSPECTION NEEDS. THIS TASK ORDER WILL ASSIST THE FOREST SERVICE BY PROVIDING NSTM AND DIFFICULT ROUTINE INSPECTIONS.
MT NP GLAC 14(5), MANY GLACIER ROAD LANDSLIDES EXCAVATION, GRADING, DRAINAGE, AGGREGATE BASE, CULVERT REPLACEMENT, AND ASPHALT SURFACE COURSE, AND THE ADDITIONAL WORK ASSOCIATED LANDSLIDE MITIGATION EFFORTS.
MT FLAP BLACKF 12(1), FLAP REHABILITATION TWO MEDICINE ROAD & MT NP GLAC 12(2), FLTP REHABILITATION OF TWO MEDICINE ROAD INTERMEDIATE DESIGN PHASES
PROFESSIONAL ENG TECHNICAL SERVICES - RPA - REGION 1 - "ON-CALL"
Business Details
- UEI
- JYVKDP2K3KH5
- CAGE Code
- 1SLG7
- Address
- 3147 SADDLE DR
HELENA, MT 596018637 - Congressional District
- MT-02
- Phone
- 4064475000
Parent Company
ROBERT PECCIA & ASSOCIATES, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov