COMPLETE ALL WORK FOR ANGEL LAKE DAM MODIFICATION IN ACCORDANCE WITH THE STATEMENT OF WORK. ALL WORK INCLUDES AND IS NOT LIMITED TO: 1. POLLUTION CONTROL 2. CONSTRUCTION SURVEYS 3. REMOVAL OF WATER 4. UNCLASSIFIED EXCAVATION 5. EMBANKMENT FIL
GAOA - GREYS RIVER CORRIDOR PHASE 3 - HAUL AND PLACE AGGREGATE ALONG ROADWAY FOR FS ROAD CREWS TO SPREAD AND CONSTRUCT THE ROADWAY.
NOTICE OF TERMINATION FOR CONVENIENCE R4 MATOC DEADMAN CORNER ROAD WIDENING UWCNF
UPPER GREEN RIVER CORRIDOR IMPROVEMENTS
JEFFERSON HUNT CAMPGROUND DECOMMISSIONING
R4 MATOC DEADMAN CORNER ROAD WIDENING UWCNF
LEFT HAND FORK HUNTINGTON CANYON TRAIL BRIDGE - MANTI LASAL NF
0410 CONST ENG BROWN/BOOTHS/STAKER TIMBER SALE ROAD IMP
GAOA FLAT CANYON CAMPGROUND
AWARD IAW MATOC PARENT CONTRACT CIVIL CONSTRUCTION UWCNF SO ASPHALT MAINTENANCE
CONSTRUCTION, PONDEROSA CAMPGROUND WATER SYSTEM IMPROVEMENTS. REGION 4 CIVIL MATOC.
CONSTRUCTION, PONDEROSA CAMPGROUND WATER SYSTEM IMPROVEMENTS. REGION 4 CIVIL MATOC.
0410 CONST ENG BROWN/BOOTHS/STAKER TIMBER SALE ROAD IMP
GAOA FLAT CANYON CAMPGROUND
0419 CONST LOWER MIDDLE BEAVER BRIDGE REPLACEMENT
0419 CONST LOWER MIDDLE BEAVER BRIDGE REPLACEMENT
0401 GAOA 4EQ DUCHESNE ROOSEVELT RD MOONLAKE SLURRY SEAL PROJECT 4
SALT CREEK #1 ROAD BRIDGE SCOUR REPAIR
GAOA-HISTORIC GUINAVAH-MALIBU TREE REMOVAL MOD 4- THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO ADD FUNDING FOR ADDITIONAL CLEARING AND GRUBBING. NO OTHER CHANGES ARE BEING MADE AT THIS TIME. MOD 3- THE PURPOSE OF THIS BILATERAL MODIFIC
GAOA - PINEVIEW RESERVOIR: CEMETERY POINT STABILIZATION PROJECT MOD 4: THE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR INSTALLING A POST AND ROPE STYLE FENCE TO REPLACE THE CONCRETE WHEEL STOPS. NO OTHER CHANGES ARE BEING MADE AT THIS T
FLAP ANF SHEEP CREEK BAY ROAD AND PARKING LOT RECONSTRUCTION
GAOA-HISTORIC GUINAVAH-MALIBU TREE REMOVAL MOD 3- THE PURPOSE OF THIS BILATERAL MODIFICATION IS TO ADD ADDITIONAL TREES FOR REMOVAL ACCORDING TO SPECIFICATIONS AND CURRENT PRICING. NO OTHER CHANGES ARE BEING MADE AT THIS TIME. MOD 2- THE P
ROAD AND BRIDGE IDIQ ZONE 2 THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE THE MINIMUM GUARANTEE FROM THE MASTER CONTRACT 1284M820D0017. ALL MINIMUM GUARANTEES UNDER THE MASTER CONTRACT HAVE BEEN MET. THIS DEOBLIGATION WILL CLOSE TASK ORDE
ELK CREEK BRIDGE REPLACEMENT, CARIBOU-TARGHEE NATIONAL FOREST REPLACEMENT OF EXISTING BRIDGE WITH NEW 22' PRE-CAST CONCRETE BRIDGE
EPHRAIM OFFICE PARKING LOT SLURRY SEAL
R4 CIM DAM COMPLIANCE: GOOSEBERRY (LOWER) DAM - TASK ORDER REGION 4 CIVIL CONSTRUCTION MATOC
UWC - LOGAN ADMIN SITE FENCE & DEFERRED MAINTENANCE
UWC - LOGAN ADMIN SITE FENCE & DEFERRED MAINTENANCE
Business Details
- UEI
- HNESFUWLGZ68
- CAGE Code
- 1HT05
- Address
- 3348 SOUTH 1575 WEST #2
OGDEN, UT 844013379 - Congressional District
- UT-01
- Phone
- 8019851115
Parent Company
MECHAM BROTHERS
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov