HUOT CONSTRUCTION AND SERVICES, INC.
SOUTH SAINT PAUL, MINNESOTA 550752499
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $15.21M | 59 |
| 238160 | $6.82M | 2 |
| 238210 | $2.53M | 2 |
| 238220 | $1.70M | 1 |
| 237310 | $1.49M | 1 |
| 238170 | $45K | 3 |
| 238290 | $5K | 1 |
Contract Awards
50 awards found
VA DMC BREAKROOM RENOVATION, WHIPPLE FEDERAL BUILDING, FORT SNELLING, MN THE PURPOSE OF THIS PROJECT IS TO RENOVATE THE BREAKROOM ON THE 4TH FLOOR OF THE VA DMC OFFICE WITHIN THE WHIPPLE FEDERAL BUILDING, FORT SNELLING, MN.
REPLACE MAIN DISTRIBUTION PANEL AND ASSOCIATED ELECTRICAL FEEDERS
MN FWS MN VLY NWR BOARDWALK
PN: 656-22-504 UPGRADE CABLE TV INFRASTRUCTURE FOR THE ST. CLOUD VAHCS
IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK, THIS AWARD IS TO PERFORM UP TO 21.23 MILES OF GRAVEL ROAD REHAB WORK AT THE MN AGASSIZ NWR.
MOD-P00004 FOR RYDELL MAINTENANCE BUILDING IS ISSUED TO EXTEND THE PERIOD OF PERFORMANCE BY (14) CALENDAR DAYS TO MONDAY, OCTOBER 20, 2025, AND INCREASE THE TOTAL CONTRACT VALUE FOR ADDITIONAL WORK BY $14,302.89 FOR A NEW TOTAL CONTRACT VALUE OF $3,0
MOD PS0002-TERMINATION FOR CONVENIENCE WELLSTONE SEWER REPAIR, WELLSTONE FEDERAL BUILDING, MINNEAPOLIS, MINNESOTA AS A RESULT OF THIS TERMINATION AGREEMENT, DECREASE ORDER AMOUNT BY $106,364.30 CHANGING TOTAL OBLIGATION FROM $110,067.30 TO $3,703.00.
656-19-324 UPGRADE OF THE PHYSICAL ACCESS CONTROL SYSTEMS (PACS)
MADISON LAB B33 WINDOW REPLACEMENT
MODIFICATION TO DEOBLIGATE MINIMUM ORDER AMOUNT. GENERAL SERVICES ADMINISTRATION (GSA) REGION 5 REPAIR AND ALTERATIONS INDEFINITE DELIVERY INDEFINITE QUANTITY CONTRACT, VARIOUS LOCATIONS GSA REGION 5.
MOD-P00002 IS ISSUED TO INCREASE THE TOTAL CONTRACT VALUE BY $5,551.50, FOR ADDITIONAL WORK TO EXECUTE SEPTIC SYSTEM UPGRADES PER POLK COUNTY, MN SEPTIC PERMIT. THESE INCLUDE INCREASING THE SIZE OF THE SEPTIC TANK FROM 1,000 GALLONS TO 1,500 GALLONS,
GAOA SUF FOREST ROAD 152 SOUTH BRULE RIVER BRIDGE REPLACEMENT.
618-25-202 REPLACE CHILLER #4 PROVIDE A LABOR AND MATERIALS TO COMPLETE WORK PER CONTRACT DOCUMENTS.
47PF0025F0336 - WELLSTONE SEWER REPAIR, WELLSTONE FEDERAL BUILDING, MINNEAPOLIS, MN
THE SELECTED CONTRACTOR SHALL PROVIDE ALL MATERIALS, LABOR, AND EQUIPMENT FOR THE PROJECT TITLED REPLACE ROOFS PHASE III AT THE FEDERAL CORRECTIONAL INSTITUTION (FCI) OXFORD LOCATED IN OXFORD, WISCONSIN IN ACCORDANCE WITH THE ATTACHED SPECIFICATIONS
MOD 1 FOR GABLE TRIM AND GUTTERS AND POP TO AGASSIZ NWR ROOF LEAK REPAIRS AND WINDOWS
REPLACE FPL PASSENGER ELEVATOR BUILDING 33 MOD 00002: CHANGES WITHIN THE SCOPE OF THE REQUIREMENT
MN-WINDOM WMD-GUTTER DOWNSPOUT INSTALL
MN-SHERBURNE NWR-COLD STORAGE BLDG MOD 2 TO ADD ADDITIONAL FUNDS TO ADD PVC CONDUIT.
INSTALLATION AND CONFIGURATION OF FIREWALL FOR THE MINNEAPOLIS VAMC
CLIN 0001-MAID-IQ-FY 24 ELECTRICAL #1
AGASSIZ NWR ROOF LEAK REPAIRS AND WINDOWS
GENERAL SERVICES ADMINISTRATION REGION 5 REPAIR AND ALTERATIONS SERVICES INDEFINITE DELIVERY INDEFINITE QUANTITY CONTRACT, VARIOUS LOCATIONS, GENERAL SERVICES ADMINISTRATION REGION 5.
RYDELL MAINTENANCE BUILDING
WI-TREMPEALEAU NWR-GARAGE ADDITION MOD 5 TO PROVIDE OVERHEAD DOOR THRESHOLDS AND EXTEND THE PERIOD OF PERFORMANCE.
GAOA B33/34 CEILING & FIRE SUPPRESSION REPLACEMENT MOD
MN-SHERBURNE NWR-COLD STORAGE BLDG
WI-TREMPEALEAU NWR-GARAGE ADDITION MOD 3 TO ADD ADDITIONAL FUNDS FOR ADDITIONAL WORK.
WI-TREMPEALEAU NWR-GARAGE ADDITION MOD 2 TO ADD ADDITIONAL FUNDS FOR FUEL PUMP NOTIFICATION LIGHT.
GAOA B33/34 CEILING & FIRE SUPPRESSION REPLACEMENT MOD
MN-FERGUS FALLS WMD-SIDING AND PAINTING
WI-TREMPEALEAU NWR-GARAGE ADDITION MOD 1 TO ADD ADDITIONAL FUNDS FOR STORMWATER CONVEYANCE, ELECTRICAL CHANGES, AND OVERHEAD DOOR FRAMING REPAIRS
GAOA B33/34 CEILING & FIRE SUPPRESSION REPLACEMENT MOD
GAOA B33/34 CEILING & FIRE SUPPRESSION REPLACEMENT MOD
MN MN VLY NWR RAPID LAKE BUNKHOUSE MOD 1 TO ADD ADDITION FUNDS IN THE AMOUNT OF $1,450.00 FOR EXTRA REPAIRS
MN-FERGUS FALLS WMD-SIDING AND PAINTING
MOD 1 FOR FIVE SENSORS TO BIG STONE CONTROLS UPGRADE
MN-FERGUS FALLS WMD-SIDING AND PAINTING
REMODELING THE FIRST-FLOOR RESTROOM IN THE ST. PAUL FIELD OFFICE
REPLACE EXISTING PASSENGER ELEVATOR, INSTALL AUTOMATIC MAIN ENTRANCE DOOR, AND REMOVE AND REPLACE EXISTING SIDEWALK TO ALLOW ABA ACCESS.
MN MN VLY NWR RAPID LAKE BUNKHOUSE
AGASSIZ WCS
GAOA B33/34 CEILING & FIRE SUPPRESSION REPLACEMENT
MADISON LAB B33 WINDOW REPLACEMENT
MN-FERGUS FALLS WMD-SIDING AND PAINTING
WI-TREMPEALEAU NWR-GARAGE ADDITION
CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND INCIDENTALS NECESSARY TO COMPLETE THE WORK IN ACCORDANCE WITH THE SOW, WAGE DETERMINATION, AND CONTRACT CLAUSES.
BIG STONE CONTROLS UPGRADE
MULTIPLE-AWARD TASK ORDER CONTRACTS (MATOC) FOR ALT/REPAIR CONSTRUCTION SERVICES FOR THE CONTINENTAL US AND HAWAII IN ANY STATE OR US TERRITORY FOR THE DEPARTMENT OF INTERIOR (DOI) AND FOREST SERVICE (FS)
MADISON LAB B33 WINDOW REPLACEMENT
Business Details
- UEI
- FEWSG1LJHBP7
- CAGE Code
- 7FZG5
- Address
- 120 BRIDGEPOINT WAY STE A
SOUTH SAINT PAUL, MN 550752499 - Congressional District
- MN-02
- Phone
- 6082126651
Parent Company
HUOT CONSTRUCTION AND SERVICES, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.