JONES, EDMUNDS & ASSOCIATES, INC.
GAINESVILLE, FLORIDA 326413631
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 541330 | $4.27M | 78 |
Contract Awards
34 awards found
SOUTHEAST REGIONAL ARCHITECT-ENGINEER {SERAE) TASK ORDER TO DESIGN TO REPLACE VEHICLE ASSEMBLY BUILDING ROOF DRAINS AND PIPING REPAIRS AT KENNEDY SPACE CENTER, FLORIDA
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF KENNEDY SPACE CENTER (KSC) WETLAND MITIGATION, PROJECT CONTROL NUMBER (PCN): 99351
DESIGN OF SANITARY SEWER INFLOW AND INFILTRATION REPAIRS PHASE 2, KSC, FL
ENGINEERING SERVICES DURING CONSTRUCTION OF REPAIR SHORELINES, VARIOUS LOCATIONS, KSC, FL
FOR REPAIR UPGRADE SEWAGE CONVEYANCE SYSTEM DESIGN
SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO PROVIDE ESDC FOR INSTALL SLUICE GATES AT 3 LOCATIONS, PAD B, AT KENNEDY SPACE CENTER. PROJECT CONTROL NUMBER 100248.
ENGINEERING DURING CONSTRUCTION SERVICES FOR VEHICLE ASSEMBLY BUILDING (VAB) PIPE REPAIR.
ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF PROTECT SHORELINE AT UNIVERSAL CAMERA SITE 12.
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF VEHICLE ASSEMBLY BUILDING (VAB) CULVERT REDESIGN TO ALLOW FOR WIDER DRIVEWAY PATH.
SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO PROVIDE A DESIGN TO REPAIR CULVERTS AT VARIOUS LOCATIONS AT KENNEDY SPACE CENTER. PROJECT CONTROL NUMBER 99588.1.
SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO PROVIDE A DESIGN TO REPAIR CULVERTS AT VARIOUS LOCATIONS AT KENNEDY SPACE CENTER. PROJECT CONTROL NUMBER 99588.1.
SOUTHEAST REGIONAL ARCHITECT-ENGINEER (SERAE) TASK ORDER TO PROVIDE A DESIGN TO REPAIR CULVERTS AT VARIOUS LOCATIONS AT KENNEDY SPACE CENTER. PROJECT CONTROL NUMBER 99588.1.
SOUTHEAST REGIONAL ARCHITECTURE-ENGINEERING (SERAE) CONTRACT. AWARD OF NEW TASK ORDER TO INSTALL SLUICE GATES AND REDESIGN VEHICLE ASSEMBLY BUILDING CULVERT. PROJECT CONTROL NUMBERS 100248 AND 100249.
DESIGN KENNEDY SPACE CENTER WETLAND MITIGATION, MOD 8 ADD TECHNICAL DIRECTIVE #8 ADD SERVICES AND EXTEND PERIOD OF PERFORMANCE (POP) TO 12/12/2024
ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF PROTECT SHORELINE AT UNIVERSAL CAMERA SITE 12.
SOUTHEAST REGIONAL ARCHITECT & ENGINEERING PROJECT CONTROL NUMBER 99563.1, DESIGN OF REPAIR SHORELINE.
DESIGN OF PROTECT SHORELINE AT UNIVERSAL CAMERA SITE 12 AT KENNEDY SPACE CENTER, PROJECT CONTROL NUMBER: 99589.1
ENGINEERING SERVICES DURING CONSTRUCTION OF UPGRADES TO KENNEDY SPACE CENTER (KSC) WATER & WASTEWATER SYSTEMS, PHASE 5 PROJECT. MOD 15: INCORPORATE TECHNICAL DIRECTIVE (TD)-13. OBLIGATION AND VALUES ARE INCREASED AND PERIOD OF PERFORMANCE IS EXTENDED
RANSOM ROAD REGIONAL POND & BORROW PIT STUDY - KENNEDY SPACE CENTER WEST STORMWATER.
ENGINEERING SERVICES DURING CONSTRUCTION OF UPGRADES TO KENNEDY SPACE CENTER (KSC) WATER & WASTEWATER SYSTEMS, PHASE 5 PROJECT. CORRECTS AN INTERNAL FUNDING SYSTEM DEOBLIGATION ERROR ASSOCIATED WITH MODIFICATION 12.
ENGINEERING SERVICES DURING CONSTRUCTION OF UPGRADES TO KENNEDY SPACE CENTER (KSC) WATER & WASTEWATER SYSTEMS, PHASE 5 PROJECT. INCORPORATES TECHNICAL DIRECTIVE FOR $18,148.00. THE END DATE IS CHANGED TO AUGUST 25, 2023.
REPLACE GROVE PUMPS. DESCOPE WORK IN ACCORDANCE WITH TECHNICAL DIRECTIVE 01. THE PERIOD OF PERFORMANCE ENDS EFFECTIVE DATE OF 03/23/2023. THE NEW TOTAL AMOUNT OF THIS CONTRACT IS $69,466.00.
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF REPAIR SHORELINES, DRAINAGE, AND DOCKS AT VARIOUS LOCATIONS. INCORPORATES TECHNICAL DIRECTIVE 04 FOR $4,780.10. PERIOD OF PERFORMANCE IS EXTENDED TO 4/28/2023.
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF REPAIR SHORELINES, DRAINAGE, AND DOCKS AT VARIOUS LOCATIONS. INCORPORATES ADDITIONAL WORK IN THE AMOUNT OF $3,896.81. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
ENGINEERING SERVICES DURING CONSTRUCTION OF UPGRADES TO KENNEDY SPACE CENTER (KSC) WATER & WASTEWATER SYSTEMS, PHASE 5 PROJECT. INCORPORATES TECHNICAL DIRECTIVE FOR AN REDUCTION $3,035.70. THE END DATE IS CHANGED TO MARCH 31, 2023.
DESIGN TO REMOVE AND REPLACE THE RAILROAD/ROADWAY CROSSING ON KENNEDY PARKWAY JUST SOUTH OF GATE 4.
NUTRIENT STUDY - KSC WEST BASIN
REPLACE GROVE PUMPS.
ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF DECONSTRUCTION OF CENTRAL INSTRUMENTATION FACILITY (CIF) M6-0342 AND HEADQUARTERS. INCORPORATES TECHNICAL DIRECTIVE (TD)-09 IN THE AMOUNT OF $3,114.00. PERIOD OF PERFORMANCE HAS CHANGED TO JANUARY 27, 2023.
ENGINEERING SERVICES DURING CONSTRUCTION (ESDC) OF DECONSTRUCTION OF CENTRAL INSTRUMENTATION FACILITY (CIF) M6-0342 AND HEADQUARTERS MOD 8:INCORPORATES TECHNICAL DIRECTIVE (TD)-08 IN THE AMOUNT OF $9,767.00. PERIOD OF PERFORMANCE HAS CHANGED TO SEPTEMBER 30, 2022.
ENGINEERING SERVICES DURING CONSTRUCTION OPERATIONS AND CHECKOUT HIGH BAY. INCORPORATES TECHNICAL DIRECTIVE 02 FOR $4,960.00. PERIOD OF PERFORMANCE END DATE IS CHANGED TO 06/17/2022. ALL OTHER TERMS AND CONDITIONS OF THIS TO REMAIN UNCHANGED.
ENGINEERING SERVICES DURING CONSTRUCTION OF UPGRADES TO KENNEDY SPACE CENTER (KSC) WATER & WASTEWATER SYSTEMS, PHASE 5 PROJECT. INCORPORATES TECHNICAL DIRECTIVE FOR AN ADDITIONAL $74,481.00. THE END DATE IS CHANGED TO NOVEMBER 30, 2022.
KSC WETLAND MITIGATION PROJECT CONTROL NUMBER 99351. INCORPORATES ADDITIONAL WORK, INCREASES TASK ORDER AND EXTENDS PERIOD OF PERFORMANCE.
ENGINEERING SERVICES DURING THE CONSTRUCTION (ESDC) OF REPAIR SHORELINES, DRAINAGE, AND DOCKS AT VARIOUS LOCATIONS. INCORPORATES TECHNICAL DIRECTIVE 02 IN THE AMOUNT OF $19,259.69. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Business Details
- UEI
- F6WKYLHJYFK7
- CAGE Code
- 0EN06
- Address
- 730 N E WALDO RD
GAINESVILLE, FL 326413631 - Congressional District
- FL-03
- Phone
- 3523775821
Parent Company
JONES, EDMUNDS & ASSOCIATES, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov