NWF CONTRACTORS INC
DBA: NWF CONTRACTORS INC
FORT WALTON BEACH, FLORIDA 325473604
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 237310 | $9.51M | 146 |
| 238110 | $4.92M | 37 |
Contract Awards
50 awards found
THIS IS A CIVIL WORKS IDIQ CONTRACT FOR WORK CONSISTING OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL.
THIS IS A CIVIL WORKS IDIQ CONTRACT FOR WORK CONSISTING OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL.
CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023 - DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023
CP1144587 EOD ARMAG WORK TO BE PERFORMED UNDER THIS TASK ORDER WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK, ACCEPTED PROPOSAL AND DRAWINGS ATTACHED IN SECTION J.
THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO REPAIR BY REPLACEMENT THE AUTOMATIC ACCESS GATE TO THE FLIGHTLINE.
REPAIR HOT WATER SUPPLY AND RETURN LINES ON THE BUILDING 1 BOILER
CP1144587 EOD ARMAG WORK TO BE PERFORMED UNDER THIS TASK ORDER WILL BE IN ACCORDANCE WITH THE STATEMENT OF WORK, ACCEPTED PROPOSAL AND DRAWINGS ATTACHED IN SECTION J.
THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO ACCOMPLISH ALL WORK COMPLETE IN PLACE, AS SHOWN ON THE DRAWINGS, SPECIFIED HEREIN, OR AS NEEDED TO THE FIRE SUPPRESSION WATER
REPLACE TWO CONCRETE SLABS ON RUNWAY 18/36
REPAIR SEVEN STORMWATER SYSTEMS AROUND HURLBURT FIELD, FLORIDA.
REPLACE TWO CONCRETE SLABS ON RUNWAY 18/36
DUKE FIELD RUNWAY FRICTION TEST
CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023- DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023
CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023- DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023
THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION, AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO ACCOMPLISH ALL WORK COMPLETE TO INSTALL COMMUNICATIONS INFRASTRUCTURE TO BUILDING 91360, WITHIN HURLBURT FIELD, FL.
THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO ACCOMPLISH ALL WORK COMPLETE IN PLACE, AS SHOWN ON THE DRAWINGS, SPECIFIED HEREIN, OR AS NEEDED TO THE FIRE SUPPRESSION WATER
CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023- DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023
REPAINT RUNWAY EDGE LINES
THIS IS A TASK ORDER OFF OF THE CIVIL WORKS IDIQ CONTRACT FOR ANNUAL RUBBER REMOVAL REQUIREMENT
CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023- DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023
THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO ACCOMPLISH ALL WORK COMPLETE IN PLACE, AS SHOWN ON THE DRAWINGS, SPECIFIED HEREIN, OR AS NEEDED TO REPAIR OR LINE VITRIFIED CL
THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION, AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO ACCOMPLISH ALL WORK COMPLETE TO INSTALL COMMUNICATIONS INFRASTRUCTURE TO BUILDING 91360, WITHIN HURLBURT FIELD, FL.
THE WORK CONSISTS OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, WASTEWATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL.
THIS IS A CIVIL WORKS IDIQ CONTRACT FOR WORK CONSISTING OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL.
THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO ACCOMPLISH ALL WORK COMPLETE IN PLACE, AS SHOWN ON THE DRAWINGS, SPECIFIED HEREIN, OR AS NEEDED TO REPAIR OR LINE VITRIFIED CL
THE WORK CONSISTS OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, WASTEWATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL IN ACCORDANCE WITH THE DOCUMENTS LISTED
THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, SUPERVISION AND EQUIPMENT AND PERFORM ALL OPERATIONS NECESSARY TO REPAIR VCP SEWER LINES WITHIN BASIN 2. THE PROJECT IS LOCATED ON HURLBURT FIELD, FL.
THE WORK IS BUT NOT LIMITED TO REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, WASTEWATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL.
THE WORK TO BE PERFORMED IN ACCORDANCE WITH SOW TO INCLUDE, BUT NOT LIMITED TO: 1. CRACK REPAIRS WILL BE SEALED WITH BACKER ROD AND COLD APPLIED JOINT SEAL.2. SPALLS TO BE REPAIRED WITHIN LIMITS OF THE EAST RAMP AND RUNWAY AS SHOWN ON THE PLANS
CONSTRUCT CONCRETE TARGETS REQUIREMENTS CONTRACT IAW: - SPECIFICATIONS C-VE-23-01 DATED 13 MARCH 2023- DRAWINGS 23-TA-C74-01 R1 DATED 13 MARCH 2023
CP1136327: RENOVATE AIRPARK FOR PUBLIC ACCESS IN ACCORDANCE WITH THE ATTACHMENTS LISTED IN SECTION J.
THE WORK CONSISTS OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, WASTEWATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL IN ACCORDANCE WITH THE DOCUMENTS LISTED
REPAIR SPALLS AND CRACKS HURLBURT FIELD FL
THE WORK CONSISTS OF, BUT NOT LIMITED TO, REPAIR, REPLACEMENT, AND MINOR CONSTRUCTION OF BASE PAVEMENTS, WATER DISTRIBUTION SYSTEMS, WASTEWATER DISTRIBUTION SYSTEMS, AND OTHER RELATED WORK AT HURLBURT FIELD, FL IN ACCORDANCE WITH THE DOCUMENTS LISTED
CONSTRUCT CONCRETE TARGETS DO 03
REPAVE HAMBY PL
REPAINT EDGE LINES AND RED LINES
REPAIR AND REPLACE TRAFFIC SIGNS
CONSTRUCT CONCRETE TARGETS DO 02
REMOVE RUBBER ON RUNWAY 18/36 FY 24
CONSTRUCT CONCRETE TARGETS IDIQ / TASK ORDER 0001 / KICK OFF MEETING
MODIFICATION - INSTALL COMMUNICATIONS CONDUIT FOR FIBER REDUNDANCY ADDENDUM #1
ADD HANDICAPPED PARKING BLDG 1
AWARD FOR REPAIR ADERHOLT FOOTBALL FIELD SINK HOLE
REPAIR STORMWATER DRAINAGE PIPE, SOUTH WEST REGIONAL POND
REPLACE STREET BUILDING SIGNS HURLBURT FIELD FL
REPAIR IRRIGATION IN EXISTING AIRPARK BY INSTALLING A NEW SYSTEM WITH CONTROLLER FOR APPROXIMATELY 195,000 SF AREA. CONNECT TO THE EXISTING REUSE WATER SUPPLY SHOWN ON THE UTILITY ATTACHMENT
ADDITIONAL FUNDING FOR FIRE HYDRANT EXTENSION
REPAIR SEWERAGE LIFT STATION 90027
REPAIR FIRE SUPPRESSION WATER LINE, B9081
Business Details
- UEI
- F5NDARJLBKC6
- CAGE Code
- 0CHA4
- Address
- 203 PELHAM RD
FORT WALTON BEACH, FL 325473604 - Congressional District
- FL-01
- Phone
- 8508625376
Parent Company
NWF CONTRACTORS INC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov