HENDERSON LOGGING, INC
WALLOWA, OREGON 978858206
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 115310 | $4.10M | 12 |
| 237310 | $1.81M | 21 |
| 532412 | $16K | 2 |
Contract Awards
23 awards found
COLD CANAL #1 MASTICATION CALL ORDER
E1, STURGILL, ORWWF000334, EXC2, EXCAVATOR, TYPE 2;
E10, NEBO, ORWWF000380, EXC2, EXCAVATOR, TYPE 2;
COLD CANAL #1 MASTICATION CALL ORDER
LOSTINE SLIDE REPAIR AND DRAINAGE MAINTENANCE CALL ORDER
LOSTINE SLIDE REPAIR AND DRAINAGE MAINTENANCE CALL ORDER
COR: WILLIAM BRENDECKE WILLIAM.BRENDECKE@USDA.GOV PERIOD OF PERFORMANCE FOR ALL ITEMS IS DATE OF AWARD THROUGH: DECEMBER 31, 2024 FOR MANDATORY ITEMS DECEMBER 31, 2025 FOR OPTIONAL ITEMS THE OBJECTIVES OF THIS PROJECT ARE TO IMPROVE PUBLIC
CLEAR ACCESS ROUTE TO BROADY CK AND REMOVE TRASH RACK
NFSR 8250 ROAD REPAIR TO ADDRESS VARIATION ON QUANTITIES, CHANGE CO, AND EXTEND POP
MOD 4 - BAER THIS PROJECT WILL IMPROVE THE EXISTING DRAINAGE ON THE ROADS WITHIN THE FIRE PERIMETER OF THE NEBO AND DOUBLE CREEK FIRES. THE WORK ITEMS INCLUDE REMOVING DEBRIS AND REBUILDING ROAD
MOD 3 - BAER THIS PROJECT WILL IMPROVE THE EXISTING DRAINAGE ON THE ROADS WITHIN THE FIRE PERIMETER OF THE NEBO AND DOUBLE CREEK FIRES. THE WORK ITEMS INCLUDE DITCH RECONDITIONING, INSTALLING CULVERTS, AND ADDING ADDITIONAL SURFACE DRAINAGE.
BAER THIS PROJECT WILL IMPROVE THE EXISTING DRAINAGE ON THE ROADS WITHIN THE FIRE PERIMETER OF THE NEBO AND DOUBLE CREEK FIRES. THE WORK ITEMS INCLUDE DITCH RECONDITIONING, INSTALLING CULVERTS, AND ADDING ADDITIONAL SURFACE DRAINAGE.
BAER THIS PROJECT WILL IMPROVE THE EXISTING DRAINAGE ON THE ROADS WITHIN THE FIRE PERIMETER OF THE NEBO AND DOUBLE CREEK FIRES. THE WORK ITEMS INCLUDE DITCH RECONDITIONING, INSTALLING CULVERTS, AND ADDING ADDITIONAL SURFACE DRAINAGE.
NFRS-54 REPAIR AND RECONSTRUCTION ON THE UMATILLA NATIONAL FOREST.
BAER THIS PROJECT WILL IMPROVE THE EXISTING DRAINAGE ON THE ROADS WITHIN THE FIRE PERIMETER OF THE NEBO AND DOUBLE CREEK FIRES. THE WORK ITEMS INCLUDE DITCH RECONDITIONING, INSTALLING CULVERTS, AND ADDING ADDITIONAL SURFACE DRAINAGE.
NFSR 8250 ROAD REPAIR
E-352, DOUBLE CREEK, OR-WWF-000400, .
PROJECT REPLACES AN EXISTING MULTI-PLATE CULVERT WITH A PRECAST CONCRETE BRIDGE. ADDITIONAL ROADWORK TO MAINTAIN ROAD SAFETY AND ACCESS ARE INCLUDED.
INSTALL GOVERNMENT FURNISHED CATTLE GUARD ON FSR 4665.
ROAD 46 PAVEMENT REPAIR
ROAD 46 PAVEMENT REPAIR
PROJECT REPLACES AN EXISTING MULTI-PLATE CULVERT WITH A PRECAST CONCRETE BRIDGE. ADDITIONAL ROADWORK TO MAINTAIN ROAD SAFETY AND ACCESS ARE INCLUDED.
WORK ITEMS INCLUDE ROADSIDE BRUSHING, ROAD RECONDITIONING INCLUDING SHOULDERS, TURNOUTS AND DITCHES AND THE PLACEMENT OF GOVERNMENT FURNISHED AGGREGATE STOCKPILED NEAR THE BEGINNING OF THE PROJECT.
Business Details
- UEI
- F4KKFYULZ9L7
- CAGE Code
- 4YN48
- Address
- 75241 UPPER DIAMOND LN
WALLOWA, OR 978858206 - Congressional District
- OR-02
- Phone
- 5418863141
Parent Company
HENDERSON LOGGING, INC
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov