E.L.C.I. CONSTRUCTION GROUP, INC.
DBA: ELCI CONSTRUCTION GROUP INC
NORTH MIAMI, FLORIDA 331615523
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 236220 | $23.94M | 46 |
| 236210 | $0 | 4 |
Contract Awards
22 awards found
CONTRACTOR TO PROVIDE ADDITIONAL WORK AND DESCOPE FOR A TOTAL AMOUNT OF $750,114.66.
CONTRACTOR SHALL ALL TOOL, EQUIPMENT, LABOR, MATERIALS, AND SUPERVISION NECESSARY TO REPLACE CORRODED GALLEY KITCHEN DUCTWORK FOR A TOTAL COST OF $111,827.78.
REPAIR AIRFIELD PAVEMENT @ USCG AIR STATION CLEARWATER, FL PNUM 17921444
MODIFICATION REASON MAJOR M&R AT U.S. COAST GUARD STATION, AIR STATIONSAVANNAH, GA. MODIFICATION REASON: ADDITIONAL WORK AND TIME EXTENSION
47PM0221F0014-HST ROOF REPLACEMENT LOCATED AT THE DOS HARRY S. TRUMAN BUILDING, 2201 C STREET NW, WASHINGTON DC, 20520. MODIFICATIONS ADDITIONAL SERVICES - MISCELLANEOUS PCOS
REPLACE UPH SEWAGE RISER AT USCG SECTOR KEY WEST, FL PNUM 22965352
MODIFICATION REASON MAJOR M&R AT U.S. COAST GUARD STATION, AIR STATIONSAVANNAH, GA. MODIFICATION REASON: ADDITIONAL WORK AND TIME EXTENSION
MODIFICATION IS FOR ADDITIONAL WORK, CREDIT TO THE GOVERNMENT AND TIME EXTENSION. TOTAL INCREASED AMOUNT IS $817,855.50 COMPLETION DATE IS CHANGED TO NOVEMBER 29, 2025.
D7 RMACC BRIDGE CONTRACT MINIMUM GUARANTEE
MAJOR M&R BUILDING 3 AND 4 AT U.S. COAST GUARD BASE MIAMI BEACH, FL PNUM 15423827
MAJOR M&R AT U.S. COAST GUARD AIR STATION SAVANNAH, GA. PNUM 6653350
MOD SERVES AS SETTLEMENT TO THE CONTRACTORS REA SUBMITTED ON 5/3/23 FOR A TOTAL AGREED AMOUNT OF $35,879.86. NEW TOTAL $822,454.73. CCD OF 4/3/23 IS CHANGED TO 9/30/23 TO ALLOW THE GOVERNMENT ADDITIONAL TIME TO PROCESS PENDING MODIFICATION.
DEMOLISH AND DISPOSE/RECYCLE OF THE EXISTING LAKE WORTH INLET LIGHT 5 (LLNR 10205) LOCATED IN THE WATER POSITION 26-46-18.318N, 080-02-10.297W NEAR FT. PIERCE, FLORIDA.
MODIFICATION FOR: REPLACEMENT OF WATER DAMAGED INSULATION, DRYWALL, AND MINOR FRAMING ELEMENTS, REPLACE WATER HAMMER ARRESTOR, PRV, REPLACE DEFECTIVE SMOKE DETECTORS, REPLACE THERMOSTATIC MIXING VALVES WITH KNOWN FAILURES.
DEMOLISH REBECCA & 28' SHOAL LIGHTS @ ANT KEY WEST, FL
THE PURPOSE OF THIS MODIFICATION IS TO FUND RFIS 39,44, AND 46.
CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL, EQUIPMENT, TOOLS, AND SUPERVISION NECESSARY TO PERFORM ADDITIONAL WORK FOR MOLD DISCOVERY AND REMEDIATION FOR A TOTAL COST OF $64,164.37. NEW TOTAL AMOUNT: $661,216.37. NEW CCD FEBRUARY 13, 2023
REASON FOR MODIFICATION: TOWER STORAGE COSTS AND TIME EXTENSION.
THE PURPOSE OF THIS MODIFICATION IS TO FUND THE FOLLOWING: 1) RFI #037 - REPLACE THE EXISTING DRAIN THAT WAS ELEVATED ABOVE THE SUBSTRATE ROOF 6B 2) RFI# 040 - INSTALL TAPERED INSULATION ROOF IN AREA 9 OF THE HST BUILDING LOCATED IN WASHINGTON, DC
THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR ADDITIONAL 65 CALENDAR DAYS FOR ADDITIONAL WORK AND MATERIAL COST FOR THE ROOF REPLACEMENT AT THE HARRY TRUMAN BUILDING LOCATED IN WASHINGTON, DC
MODIFICATION IS ISSUED FOR THE PERFORMANCE OF ADDITIONAL WORK IN THE TOTAL AMOUNT OF $36,501.39.
MODIFICATION PS0002- TASK ORDER NO. 47PM0221F0014 IS HEREBY MODIFIED TO EXERCISE OPTION 1 FOR DESIGN-BUILD CONSTRUCTION SERVICES FOR THE HST ROOF REPLACEMENT PROJECT AT THE HARRY S. TRUMAN BUILDING (HST) LOCATED AT 2201 C STREET NW, WASHINGTON, DC
Business Details
- UEI
- D328ELWGNPU5
- CAGE Code
- 4LWC2
- Address
- 626 NE 124TH ST
NORTH MIAMI, FL 331615523 - Congressional District
- FL-24
- Phone
- 3058917990
Parent Company
E.L.C.I. CONSTRUCTION GROUP, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.