ARROW INDIAN CONTRACTORS, INC.
TEMPE, ARIZONA 852812304
Top Industries (NAICS)
| NAICS Code | Obligations | Awards |
|---|---|---|
| 237310 | $6.05M | 52 |
| 237110 | $5.89M | 9 |
| 236220 | $1.38M | 23 |
| 238320 | $175K | 1 |
| 238210 | $165K | 1 |
| 238160 | $85K | 4 |
| 562910 | $45K | 1 |
| 238990 | $44K | 3 |
| 238110 | $43K | 1 |
| 237120 | $19K | 2 |
Contract Awards
50 awards found
55TH RGS UTILIZES PARKING LOTS PA1540 04, PA1740 01, THESE LOTS DETERIORATED AND REQUIRE SUSTAINMENT MAINTENANCE REPAIR. GENERAL NATURE OF THE SUSTAINMENT ARE SURFACE TREATMENTS, CRACK FILLING, AND RESTORATION OF EXISTING PAVEMENT MARKINGS.
THE PRINCIPAL ROADS FOR 309TH AMARG COMPLEX HAVE DETERIORATED, AND SUSTAINMENT MAINTENANCE AND REPAIR ARE REQUIRED TO EXTEND SERVICE LIFE. SUSTAINMENT MAINTENANCE IS SURFACE TREATMENTS, CRACK-FILL, AND RESTORATION OF EXISTING PAVEMENT MARKINGS.
SAGU PMIS 250149 - GEORGE CLAYTON GREENE HOUSE REHABILITATION AT SAGUARO NATIONAL PARK
THE PARKING LOT FOR THE 355TH SFS, B1358, REQUIRE SUSTAINMENT MAINTENANCE AND REPAIR TO EXTEND SERVICE LIFE IAW SOW. GENERAL NATURE OF THE SUSTAINMENT MAINTENANCE ARE SURFACE TREATMENTS, CRACK FILL, AND RESTORATION OF EXISTING PAVEMENT MARKINGS.
THE PARKING LOTS FOR THE 355TH MXG, B5500, REQUIRE SUSTAINMENT MAINTENANCE AND REPAIR TO EXTEND SERVICE LIFE IAW SOW. GENERAL NATURE OF THE SUSTAINMENT MAINTENANCE ARE SURFACE TREATMENTS, CRACK FILL, AND RESTORATION OF EXISTING PAVEMENT MARKINGS.
R00001 ADDITIONAL TIME & COST FOR UNDERGROUND UTILITY REPAIRS & RELOCATION OF DISCOVERED UNMARKED UTILITIES. TOTAL CONTRACT PRICE INCREASED BY $293,220.00. THE CONTRACT COMPLETION DATE SHALL BE EXTENDED BY 64 CALENDAR. CONTRACT NEW CCD IS 02/07/2025
AIRFIELD/STREET/PARKING LOT MAINTENANCE AND REPAIR INCLUDING DEMOLITION, UTILITY WORK, SUB-GRADE PREPARATION, CONCRETE CURB, BASE COURSE, ASPHALT SURFACE, SIDEWALK, STRIPING, DRAINAGE, ETC. ON DAVIS-MONTHAN AFB AND AMARG IAW SOW.
THE PURPOSE OF THIS COMBINED SYNOPSIS / SOLICITATION FOR COMMERCIAL ITEMS PREPARED IN ACCORDANCE WITH THE FORMAT IN THE FEDERAL ACQUISITION REGULATIONS (FAR) SUBPART 12.6, AS SUPPLEMENTED WITH ADDITIONAL INFORMATION INCLUDED IN THIS NOTICE. IS TO SEE
THIS REQUIREMENT IS FOR A 60FT BY 60FT CONCRETE PAD FOR THE WASHING AND STORAGE OF BOATS. THE CURRENT LOCATION IS DIRT WHICH RUTS DURING WASHING AND RAIN EVENTS. THE LOCATION OF THE PAD IS TO BE ADJACENT TO BUILDING 4868.
REPAIRING FIFTH STREET ON DAVIS-MONTHAN AFB, AN ACC PAVEMENT WITH TRANSVERSE BLOCK CRACKING AND MINOR SETTLING. PROJECT AIMS TO ARREST DAMAGE AND EXTEND SERVICE LIFE TO MAXIMUM EXTENT POSSIBLE.
AZ FLAP 202(2) RED CLOUD MINE ROAD THE PURPOSE OF THIS MODIFICATION IS TO DEOBLIGATE REMAINING FUNDS ($250,088.08) AND CLOSE OUT THE CONTRACT.
AMARG TAXIWAY AND APRONS PHASE 3 AIRFIELD/STREET/PARKING LOT MAINTENANCE AND REPAIR INCLUDING DEMOLITION, UTILITY WORK, SUB-GRADE PREPARATION, CONCRETE CURB, BASE COURSE, ASPHALT SURFACE, SIDEWALK, STRIPING, DRAINAGE, ETC. ON DAVIS-MONTHAN AFB, AZ.
THIS WORK ELEMENT CONSISTS OF THE PERFORMANCE OF ALL WORK NECESSARY TO PLACE BOLLARDS IN FRONT OF THE ENTRANCE OF THE BX IN ACCORDANCE WITH THE STATEMENT OF WORK.
CONTRACTOR SHALL PERFORM ALL OPERATIONS ASSOCIATED WITH THE REMOVAL OF THE EXISTING GRAVEL, SCARIFYING THE TOP CLAY SOIL, AND INSTALLING BASE COURSE AND ASPHALT WEARING SURFACE TO ACCOMMODATE TYPICAL VEHICULAR TRAFFIC FOR A PARKING SURFACE.
REPAIRING FIFTH STREET ON DAVIS-MONTHAN AFB, AN ACC PAVEMENT WITH TRANSVERSE BLOCK CRACKING AND MINOR SETTLING. PROJECT AIMS TO ARREST DAMAGE AND EXTEND SERVICE LIFE TO MAXIMUM EXTENT POSSIBLE.
THIS REQUIREMENT IS FOR A 60FT BY 60FT CONCRETE PAD FOR THE WASHING AND STORAGE OF BOATS. THE CURRENT LOCATION IS DIRT WHICH RUTS DURING WASHING AND RAIN EVENTS. THE LOCATION OF THE PAD IS TO BE ADJACENT TO BUILDING 4868.
THIS WORK ELEMENT CONSISTS OF THE PERFORMANCE OF ALL WORK NECESSARY TO PLACE BOLLARDS IN FRONT OF THE ENTRANCE OF THE BX IN ACCORDANCE WITH THE STATEMENT OF WORK.
CHAPEL ROAD REPAIR
EIGHT SECTIONS OF PARKING LOTS HAVE WEATHERED AND NOW MAINTENANCE IS REQUIRED. SUSTAINMENT INCLUDES SURFACE TREATMENTS, CRACK FILL, AND RESTORATION OF EXISTING PAVEMENT MARKINGS. ADDITIONAL INFORMATION IS IN THE ATTACHED SOW DATED 20 MAY 2024.
SWEEP WORK AREA, REPAIR CRACKS, AND RE-STRIPE FROM LINE OF DEMARCATION AT THE GOLF LINKS RD. AND CRAYCROFT RD. INTERSECTION TO THE INTERSECTION AT ARIZOLA RD. AND CRAYCROFT RD.
PROJECT CONSISTS OF APPLICATION OF CRACK SEALANT AND SURFACE SEALER (FOG SEAL) TO MULTIPLE AREAS OF ASPHALT PAVEMENTS LOCATED ON THE ACTIVE AIRFIELD AT DAVIS-MONTHAN AFB. WORK ALSO INCLUDES APPLICATION OF PAINTED PAVEMENT MARKINGS AS SHOWN ON POW
CONTRACTOR SHALL PERFORM ALL OPS ASSOCIATED WITH AIRFIELD/STREET/PARKING LOT MX AND REPAIR INCLUDING DEMO, UTILITY WORK, SUB-GRADE PREP, CONCRETE CURB, BASE COURSE, ASPHALT SURFACE, SIDEWALK, STRIPING, DRAINAGE, ETC. ON DAVIS-MONTHAN AFB, AZ.
DESIGN, INSPECTION, AND REPAIR TO PORTIONS OF THE HOT SHOT RANCH, HAPPY JACK WORK CENTER MAIN OFFICE AND TRIPLE WIDE OFFICE AT CAMP CLOVER DAMAGED DUE TO EXCESSIVE SNOW LOADING
MUNITIONS TRAILER
CONSTRUCTION OF CONCRETE PAD AND SIDEWALKS FOR BENKO GYM RESCUE REQUIREMENT
REPAIR & REPLACE SEWER & WATER MAINS
TUCSON BORDER PATROL HEADQUARTERS PARKING LOT REPAIRS.
THIS TASK ORDER IS TO PROVIDE ALL NECESSARY EQUIPMENT, LABOR AND TOOLS TO REPAIR THE GRADE AND BACKFILL THE EROSION ISSUES, THUS PROVIDING A SMOOTH COMPACTED PARKING SURFACE AT THREE POINTS BPS IN TUCSON, AZ
MUNITIONS TRAILER
SAGU PR PAINT RMD BUILDINGS
ORPI HOUSE 23 REPAIRS
REPAIR CRACKS, APPLY SURFACE SEALANT, AND REPAINT MARKINGS ON PAVEMENT SHOULDERS AT MULTIPLE LOCATIONS ON THE AIRFIELD AT DAVIS-MONTHAN AIR FORCE BASE.
TASK ORDER TO REMOVE EXISTING CURBING, SIDEWALK AND, GUTTERS TO CREATE A TURN-AROUND LANE AND GATE POCKET AT CRAYCROFT GATE IN PREPARATION FOR NEW CLOSURE GATES.
THE PURPOSE OF THIS MODIFICATION IS TO FACILITATE CONTRACT CLOSEOUT AND DEOBLIGATE EXCESS FUNDING. ALL WORK HAS BEEN COMPLETED.
DESIGN, INSPECTION, AND REPAIR TO PORTIONS OF THE HOT SHOT RANCH, HAPPY JACK WORK CENTER MAIN OFFICE AND TRIPLE WIDE OFFICE AT CAMP CLOVER DAMAGED DUE TO EXCESSIVE SNOW LOADING
DESIGN, INSPECTION, AND REPAIR TO PORTIONS OF THE HOT SHOT RANCH, HAPPY JACK WORK CENTER MAIN OFFICE AND TRIPLE WIDE OFFICE AT CAMP CLOVER DAMAGED DUE TO EXCESSIVE SNOW LOADING
TASK ORDER FOR REMOVAL AND REPLACEMENT OF CONCRETE CURBS / GUTTERS AND MULTIPLE CONCRETE SLABS AT FACILITY.
MINOR DEMOLITION, REMEDIATION AND RENOVATION OF 2 BUILDINGS ON MOGOLLON RIM RANGER DISTRICT AT HAPPY JACK WORK. QUARTERS 40025 AND 40022.
TASK ORDER TO REMOVE EXISTING CURBING, SIDEWALK AND, GUTTERS TO CREATE A TURN-AROUND LANE AND GATE POCKET AT CRAYCROFT GATE IN PREPARATION FOR NEW CLOSURE GATES.
EMERGENCY REPLACEMENT OF A PROPANE GAS LINE THAT IS LEAKING. THE GAS LINE PROVIDE FUEL TO HEAT THE BUILDING
SAGU PMIS 250149 - GEORGE CLAYTON GREENE HOUSE REHABILITATION AT SAGUARO NATIONAL PARK
PKA: TASK ORDER FOR ROAD SURVEY WORK
ORGAN PIPE CACTUS NATIONAL MONUMENT REPAIR AJO MOUNTAIN DRIVE - CHANGE
USDC CARPET REPLACEMENT IN SUITE 150 LOCATED AT 401 W. WASHINGTON STREET., PHOENIX, AZ
THE PURPOSE OF THIS BILATERAL MODIFICATION#1 IS TO: A) TO INCREASE FUNDING DUE TO ADDITIONAL WORK, WITHIN ORIGINAL SCOPE OF WORK. B) CLIN 00020 IS ADDED TO INCREASE THE CONTRACT VALUE IN THE AMOUNT OF $10,049.88. C) THE CONTRACT VALUE HAS INCREAS
CHANGE ORDER - HAZMAT CEILING DEMOLITION, GEORGE CLAYTON GREENE HOUSE REHABILITATION, SAGUARO NATIONAL PARK
PROCUREMENT FOR DOUGLAS SHOP HEATER REPLACEMENT, DOUGLAS, AZ AND REPAIR AGO VEHICLE WASH, AJO, AZ 85321-0000 AS A DIRECT 8A AWARD TO ARROW INDIAN CONTRACTORS.
AJO STATION FRENCH DRAINS AND GATES INSTALLATION
MOD 1 IS TO INCORPORATE ADDITIONAL PAVING, ORPI REPAIR AJO MOUNTAIN DRIVE
MOD 3 IS TO DELETE PORTION OF WORK AND ADD ADDITIONAL WORK, GRCA-LIFT/DRYING BED
Business Details
- UEI
- D1LRKHNWT971
- CAGE Code
- 1E3L6
- Address
- 449 S 48TH ST STE 101
TEMPE, AZ 852812304 - Congressional District
- AZ-04
- Phone
- 4807765821
Parent Company
ARROW INDIAN CONTRACTORS, INC.
Data Source
This profile is based on federal contract award data from USAspending.gov.
View on USAspending.gov