Federal Contract Awards
Showing 1-50 of 1,898+ contract awards
140S0326C0001
Department of the Interior
POLLYANNA 2 PERMIT 4105 AMD PROJECT
140L2625C0001
Mod P00001Department of the Interior
GAOA PINK HOUSE LIFT STATION REPLACEMENT
140R6025C0004
Mod P00001Department of the Interior
THE PURPOSE OF THIS MODIFICATION IS TO ENSURE COMPLIANCE WITH UPDATED FEDERAL GUIDANCE AND TO ELIMINATE NON-STATUTORY SUSTAINABILITY REQUIREMENTS, AS WELL AS ENHANCE THE REPRESENTATIONAL AND CERTIFICATION CLAUSES WITHIN THE CONTRACT.
140P5225P0066
Mod P00001Department of the Interior
MOD P0001 CO1 EQUITABLE ADJUSTMENT IN PRICE AND SCHEDULE REPLACE RETAINING WALL (BATTERY PENSACOLA) GULF ISLANDS NATONAL SEASHORE, FORT PICKENS AREA 3500 FORT PICKENS ROAD (WEST OF PENSACOLA BEACH), ESCAMBIA COUNTY, FLORIDA
140P2025C0020
Mod P00002Department of the Interior
THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE RFP 0001 REMOVAL OF STEEL LEVELING PIPE.
140L5725C0007
Mod P00001Department of the Interior
STOCKTON NE PARCEL NTCRA
140P2024C0026
Mod P00027Department of the Interior
ZION 317454/240254/319664/352304 - REHABILITATE SOUTH CAMPGROUND WITH CAPITAL IMPROVEMENTS AND CONSTRUCT WILDERNESS PERMIT OFFICE AND FEE STATION IN SOUTH CAMPGROUND, ZION NATIONAL PARK.
140FC124C0035
Mod P00002Department of the Interior
THE PURPOSE OF THIS MODIFICATION IS TO ENSURE COMPLIANCE WITH UPDATED FEDERAL GUIDANCE AND TO ELIMINATE NON-STATUTORY SUSTAINABILITY REQUIREMENTS, AS WELL AS ENHANCE THE REPRESENTATIONAL AND CERTIFICATION CLAUSES WITHIN THE CONTRACT.
140L2625C0002
Mod P00001Department of the Interior
GAOA COVE BOAT RAMP AND SHORELINE STABILIZATION
140P2026C0003
Department of the Interior
THE PURPOSE OF THIS PROJECT IS TO PROVIDE CERTAIN SPECIFIC EMERGENCY STABILIZATION MEASURES PRIOR TO THE CLOSURE OF THE NORTH RIM FOR THE WINTER OF 2025/2026 IN ORDER TO MITIGATE SOME OF THE EXISTING SAFETY HAZARDS AND REDUCE THE RISK OF MIGRATION OF
140L2625C0006
Mod P00001Department of the Interior
GAOA COEUR D'ALENE SITE FURNISHINGS
140P2024C0026
Mod P00026Department of the Interior
ZION 317454/240254/319664/352304 - REHABILITATE SOUTH CAMPGROUND WITH CAPITAL IMPROVEMENTS AND CONSTRUCT WILDERNESS PERMIT OFFICE AND FEE STATION IN SOUTH CAMPGROUND, ZION NATIONAL PARK.
140L0625C0015
Mod P00002Department of the Interior
FORMOSA MINE SUPERFUND SITE REMOVAL
140L2625C0003
Mod P00001Department of the Interior
GAOA BAYHORSE RECREATION SITE REPAIRS
140R2025C0006
Mod P00001Department of the Interior
THE PURPOSE OF THIS MODIFICATION IS TO REVISE (1) SECTION C AND (2) SECTION I.
140R1023C0004
Mod P00007Department of the Interior
CANCEL AND RESCIND CHANGE ORDER MODIFICATION P00006.
140P2024C0088
Mod P00009Department of the Interior
SLBE 318729 - REHABILITATION OF MANITOU ISLANDS, AT SLEEPING BEAR DUNES NATIONAL LAKESHORE, MI
140P2024C0026
Mod P00025Department of the Interior
ZION 317454/240254/319664/352304 - REHABILITATE SOUTH CAMPGROUND WITH CAPITAL IMPROVEMENTS AND CONSTRUCT WILDERNESS PERMIT OFFICE AND FEE STATION IN SOUTH CAMPGROUND, ZION NATIONAL PARK.
140P2025C0038
Mod P00001Department of the Interior
THE PURPOSE OF THIS MODIFICATION IS TO ENSURE COMPLIANCE WITH UPDATED FEDERAL GUIDANCE AND TO ELIMINATE NON-STATUTORY SUSTAINABILITY REQUIREMENTS, AS WELL AS ENHANCE THE REPRESENTATIONAL AND CERTIFICATION CLAUSES WITHIN THE CONTRACT.
140R2022C0007
Mod P00014Department of the Interior
BF SISK SAFETY OF DAMS (SOD) MODIFICATIONS, PHASE I, THIS PHASE INCLUDES CONSTRUCTION OF SHEAR KEYS, STABILITY BERMS, AND SPILLWAY MODIFICATION. THE PROJECT WILL ADDRESS ISSUES WITH THE SELECT FOUNDATION MATERIALS THAT THE DAM WAS BUILT UPON AND WILL
140R6023C0002
Mod P00010Department of the Interior
FRESNO DAM MODIFICATIONS, MILK RIVER PROJECT, MONTANA
140R6021C0015
Mod P00013Department of the Interior
GLEN ELDER DAM SPILLWAY CHUTE REPLACEMENT, GLEN ELDER UNIT, SOLOMON DIVISION, PICK-SLOAN MISSOURI BASIN PROGRAM, KANSAS
140L0625C0015
Mod P00001Department of the Interior
FORMOSA MINE SUPERFUND SITE REMOVAL
140P2024C0026
Mod P00024Department of the Interior
ZION 317454/240254/319664/352304 - REHABILITATE SOUTH CAMPGROUND WITH CAPITAL IMPROVEMENTS AND CONSTRUCT WILDERNESS PERMIT OFFICE AND FEE STATION IN SOUTH CAMPGROUND, ZION NATIONAL PARK.
140P2024C0088
Mod P00008Department of the Interior
SLBE 318729 - REHABILITATION OF MANITOU ISLANDS, AT SLEEPING BEAR DUNES NATIONAL LAKESHORE, MI
140PS125C0013
Department of the Interior
CARL- HISTORIC DRIVE CULVERT TEMP REPAIR
140FGA25C0021
Department of the Interior
GAOA - ALASKA PENINSULA NWR FLOAT PLANE DOCK REPLACEMENT
140P2023C0046
Mod P00006Department of the Interior
CHOH 245002 287711 - REPAIR CANAL INLET LOCK 1 AND LIFT GATES 1, 2, AND 5 AND RECONSTRUCT GEORGETOWN CANAL WALLS
140L5725C0007
Department of the Interior
STOCKTON NE PARCEL NTCRA
140FC225C0004
Department of the Interior
DESIGN & BUILD REHAB OFFICE SPACE AT DING DARLING NWR
140L6225P0047
Department of the Interior
BLM-WY-NEW FORK VAULT TOILET INSTALLATION
140P2023C0121
Mod P00011Department of the Interior
DRTO 244370/244372 - REPAIRS TO FORT JEFFERSON COUNTERSCARP & MAINTENANCE DREDGING AT DRY TORTUGAS NATIONAL PARK THE PURPOSE OF MODIFICATION P00011 IS TO DEFINITIZE MOD P00010 - RFP 11 WORK, WHICH INVOLVES PERFORMING ADDITIONAL REPAIRS ALONG FRO
140P2024C0088
Mod P00007Department of the Interior
SLBE 318729 - REHABILITATION OF MANITOU ISLANDS, AT SLEEPING BEAR DUNES NATIONAL LAKESHORE, MI
140P2025C0069
Department of the Interior
YOSE 228647 REHABILITATE TUOLUMNE MEADOWS WATER DISTRIBUTION SYSTEM. THIS PROJECT REHABILITATES THE TUOLUMNE MEADOWS WATER DISTRIBUTION SYSTEM THAT PROVIDES AN AVERAGE OF 34,000 GALLONS OF POTABLE WATER A DAY AND A DAILY MAXIMUM OF 73,000 GALLONS
140L2625C0006
Department of the Interior
GAOA COEUR D'ALENE SITE FURNISHINGS
140P2022C0027
Mod P00014Department of the Interior
GOLDEN GATE NATIONAL RECREATION AREA - STABILIZE ALCATRAZ WHARF THIS PROJECT WILL MAKE CRITICAL REPAIRS TO AND SEISMICALLY STRENGTHEN THE CONCRETE WHARF ON ALCATRAZ ISLAND, A CONTRIBUTING FEATURE OF THE ALCATRAZ ISLAND NATIONAL HISTORIC LANDMARK D
140L3625C0002
Mod P00001Department of the Interior
DEAN S. RECREATION SITE
140F0420C0027
Mod P00008Department of the Interior
NC SWANQUARTER NWR NORTH CAROLINA C/O MATTAMUSKEET NWR MODIFICATION: TO DE-OBLIGATE FUNDS TO CREDIT THE GOVERNMENT.
140L1725P0078
Department of the Interior
BLM-CO TRFO BRADFIELD CAMPGROUND IMPROVEMENTS
140L4320F0019
Mod P00003Department of the Interior
MATOC FOR HORIZONTAL REPAIR AND CONSTRUCTION SERVICES, OREGON, WASHINGTON, AND IDAHO - DEOBLIGATION
140L1225F0059
Department of the Interior
CDD AML PINTO IV
140L1225P0101
Department of the Interior
REDDING AML 2025
140FGA25C0005
Mod P00001Department of the Interior
PAHRANAGAT NWR UPPER DAM DESIGN/BUILD PROJECT
140P5425C0023
Department of the Interior
CONSTRUCTION, REPLACE BACKCOUNTRY CAMPING PLATFORMS AND DOCK AT EVERGLADES NATIONAL PARK
140R3024F0070
Mod P00003Department of the Interior
REPLACEMENT OF INTAKE TOWER CYLINDER GATE STEM ASSEMBLIES - DELAY COSTS FOR DEMOBILIZATION AND REMOBILIZATION
140P4225C0007
Department of the Interior
FORT NECESSITY NATIONAL BATTLEFIELD (FONE) REHABILITATE VISITOR CENTER BLOCK RETAINING WALL
140R6018C0015
Mod P00062Department of the Interior
BULL LAKE DAM SPILLWAY MODIFICATIONS, RIVERTON UNIT, PICK-SLOAN MISSOURI BASIN PROGRAM, WYOMING
140R1023C0008
Mod P00039Department of the Interior
CLE ELUM DAM FISH PASSAGE FACILITY ADULT FACILITY, YAKIMA RIVER BASIN WATER ENHANCEMENT PROJECT, WASHINGTON: FY 25 SWEPT INCREMENTAL FUNDING
140A2325P0266
Mod P00001Department of the Interior
REPLACE/INSTALL CHAIN LINK FENCE LAGOON
140R4025C0001
Mod P00001Department of the Interior
THE PURPOSE OF THIS MODIFICATION IS TO ENSURE COMPLIANCE WITH UPDATED FEDERAL GUIDANCE AND TO ELIMINATE NON-STATUTORY SUSTAINABILITY REQUIREMENTS, AS WELL AS ENHANCE THE REPRESENTATIONAL AND CERTIFICATION CLAUSES WITHIN THE CONTRACT.
Explore Related Data
Contract Award Resources
Federal contract award data is sourced from USAspending.gov and updated regularly. Use the filters above to narrow down awards by fiscal year, NAICS code, agency, and state.